# The Grid

> Transmission, distribution, and interconnection — the wires and software that move electrons from where they're generated to where they're needed.

**Pillar:** [Energy Production](https://moreenergycleanplanet.com/sectors/energy-production) · **Status:** live · **As of:** 2026-05-28

## Key claims

- A 2,290 GW interconnection queue against 1,260 GW of total installed capacity means the grid, not generation, is now the binding constraint on adding clean power. _(Queued Up: 2025 Edition)_
- A 4.5-year median wait from interconnection request to operation is the bottleneck that strands cheap generation, making queue reform as decisive as any cost curve. _(Queued Up: 2025 Edition)_
- Reconductoring can roughly double capacity on existing corridors, a faster path than the 412% transmission expansion otherwise needed by 2035 to move the electrons. _(Accelerating transmission capacity expansion by using advanced conductors in existing right-of-way)_

## Analysis

Transmission, distribution, and interconnection — the wires and software that move electrons from where they're generated to where they're needed.

### What it is: The delivery system. The bottleneck.

The grid is high-voltage transmission lines, distribution lines, substations, transformers, the interconnection queue, the rights-of-way, the planning processes, and the regulatory machinery that decides which generator gets to plug in and when. It is not generation; it is delivery. Every clean electron the rest of this pillar produces has to ride a wire to a customer or it doesn't count.

Today the US has **1,260 GW** of installed generating capacity (EIA Electric Power Annual 2024). Sitting in the interconnection queue, waiting for a connection it cannot get fast enough, is **2,290 GW** of new generation + storage (LBNL Queued Up 2025) — roughly 1.8x the entire existing fleet, 95 percent of which is clean. Median wait from queue entry to commercial operation has roughly doubled to 4.5 years; 77 percent of capacity that entered the queue between 2000 and 2019 withdrew before it ever got built. The DOE National Transmission Needs Study estimates that meeting clean-energy + high-load growth requires **412 percent** growth in interregional transmission capacity by 2035.

The bottleneck is solvable, not by waiting a decade for greenfield permitting reform but by riding two parallel tracks at once. Track one: **reconductoring** — replacing aluminum-conductor-steel-reinforced (ACSR) wire with advanced conductors (carbon-composite-core, aluminum-zirconium alloy) on existing rights-of-way doubles line capacity in 18 to 36 months at a fraction of greenfield cost (PNAS, Berkeley GSPP + GridLab, April 2024). Track two: the named **HVDC pipeline** — SunZia (3 GW, commissioning 2026), TransWest Express (3 GW, ops 2031), Champlain Hudson Power Express (1.25 GW, commercial ops May 13, 2026), Grain Belt Express Phase 1 (1.5 GW, federal review restarted January 2026). 8.75 GW named pipeline is the second-grid backbone forming.

### The crossover: The grid is the constraint between the curves.

Manufactured energy is cheap. Extractive energy is expensive. Between them sits the grid — the bottleneck the rest of the pillar has to ride through. The chart marks this sector as the delivery layer the crossover demands.

**Figure — Manufactured vs extractive energy curves, with the grid marked as the delivery bottleneck between them.** Interactive chart and accessible data table: [/embed/the-grid-two-curves](/embed/the-grid-two-curves).

### The Second Grid: 2,290 GW vs 1,260 GW. Reconductoring doubles existing lines. HVDC pipeline is 8.75 GW named.

The chart stacks the three numbers that matter on one axis: the existing fleet, the queue waiting to plug in, and the reconductoring delta available on rights-of-way the country already owns. The Second Grid is not a metaphor — it is the additional throughput the existing wires can carry once advanced conductors replace ACSR, plus the named HVDC pipeline plumbed across the seams that today's three asynchronous grid interconnections leave open.

**Figure — The Second Grid: existing fleet vs interconnection queue vs reconductoring delta on one axis.** Interactive chart and accessible data table: [/embed/the-grid-second-grid](/embed/the-grid-second-grid).

### Technology: Conductors, converter stations, software, the interconnection queue.

**Advanced conductors** — TS Conductor's carbon-composite core, CTC Global's ACCC, Southwire's hybrid alloys — operate at higher temperatures with lower sag than ACSR, doubling line throughput on existing structures. TS Conductor's $134M Huger, South Carolina factory (groundbreaking 2025; commissioning 2026) is the first US-domestic high-volume plant. **HVDC converter stations** — Hitachi Energy (SunZia bipolar 525 kV), Siemens Energy, GE Vernova — convert AC-DC-AC to move bulk power across long distances with lower losses than AC. **Grid-enhancing technologies** (GETs) include dynamic line ratings, topology optimization (NewGrid), advanced power-flow control (Smart Wires). **Grid software** — Aurora Energy Research, GridStatus, PJM's market software, MISO's queue cluster studies — runs the planning, settlement, and reliability layer.

The interconnection queue is itself a technology problem. FERC Order 2023 (July 2023) replaced first-come-first-served serial studies with cluster studies, batch-processing applicants together — every RTO is filing compliance plans through 2024–2026. PJM, MISO, and ERCOT cluster reforms are at various states of effect. The Order is the regulatory delta the queue is finally bending against.

### Thesis role: Enabling every downstream sector. The throughput floor.

Cheap solar electrons that cannot reach a customer don't unlock anything. The grid is the throughput floor under the entire cascade. [Data centers](/sectors/data-centers) need transmission to site near power; [electrified buildings + transport](/sectors/buildings-and-transportation) need distribution upgrades to handle the new load; [green hydrogen](/sectors/green-hydrogen) needs interconnection points at low-cost renewable zones; [DAC](/sectors/dac) needs surplus clean power siting. The grid does not produce the threshold; the grid is what the threshold gets delivered on.

### Policy drivers: FERC Order 2023, IIJA GRIP, IRA transmission credits, state siting reform.

**FERC Order 2023** (July 2023) is the queue reform — cluster studies replace serial, raising the bar for queue entry, batch-processing applicants, with compliance plans filed by every RTO through 2024 to 2026. **FERC Order 1920** (May 2024) is the long-term-planning reform — requires transmission planners to identify needs on 20-year horizons. **IIJA's GRIP program** deploys $10.5 billion over FY22-26 in three rounds; Round 1 awarded $3.46 billion to 58 projects in October 2023; Round 2 awarded $4.2 billion to 46 projects in October 2024; approximately $1 billion in Round-2 awards were cancelled in October 2025 (track per the bugs file). **IRA Section 48E ITC** applies to standalone storage paired with transmission; **DOE LPO** finances anchor transmission lines. State-level permitting reform — Texas SB 6 + ERCOT cluster studies, California AB 205 — is where the action sits below the federal line.

## Data

| indicator | value | goal (year) | as of | source |
|---|---|---|---|---|
| US interconnection queue capacity | 2,290 GW ⚠ stale | — | 2024-12-31 | Queued Up: 2025 Edition |
| US transmission expansion needed by 2035 (interregional, high-growth scenario) | 412 % expansion ⚠ stale | 412 % expansion (2035) | 2023-06-30 | National Transmission Needs Study |
| US installed electric generating capacity | 1,260 GW ⚠ stale | — | 2024-12-31 | Electric Power Annual 2024 |
| Reconductoring capacity-gain potential on existing corridors | 2 x multiplier ⚠ stale | 2 x multiplier (2035) | 2024-04-09 | Accelerating transmission capacity expansion by using advanced conductors in existing right-of-way |
| Major US HVDC inter-grid project pipeline | 8.75 GW | — | 2026-05-28 | SunZia Wind and Transmission |
| Median time, interconnection request to commercial operation | 4.5 years ⚠ stale | — | 2024-12-31 | Queued Up: 2025 Edition |

## Companies

- **[Ampere](https://moreenergycleanplanet.com/ecosystem#company/ampere)** (seed) — Software platform automating large-load interconnection studies and grid services applications, addressing the multi-year queue delays that constrain data center, electrolyzer, and industrial electrification projects.
- **[Base Power](https://moreenergycleanplanet.com/ecosystem#company/base-power)** (series_c) — Texas residential battery operator selling fixed-rate home electricity with included whole-home backup battery, then aggregating thousands of homes into a virtual power plant participating in ERCOT markets, expanding nationally with $1B Series C.
- **[CTC Global](https://moreenergycleanplanet.com/ecosystem#company/ctc-global)** (commercial) — US advanced-conductor OEM; ACCC (Aluminum Conductor Composite Core) deployed at scale across US utilities. ~100K km cumulative deployment globally; mature deployment record with named US transmission projects.
- **[Entergy Louisiana](https://moreenergycleanplanet.com/ecosystem#company/entergy-louisiana)** (commercial) — Regulated utility building the initial generation and grid package for Meta Hyperion, including about 2,262 MW of gas generation and procurement for up to 1,500 MW of solar.
- **[GridStatus.io](https://moreenergycleanplanet.com/ecosystem#company/gridstatus)** (commercial) — Public ISO/RTO grid-data platform; standardized real-time API + dashboards across PJM, MISO, ERCOT, CAISO, NYISO, ISO-NE, SPP. The analyst-facing transparency layer used by traders, researchers, journalists.
- **[Hitachi Energy](https://moreenergycleanplanet.com/ecosystem#company/hitachi-energy)** (commercial) — Global HVDC + power-equipment OEM (Hitachi-ABB Power Grids JV formed 2020; renamed Hitachi Energy 2021). Bipolar 525 kV HVDC for SunZia transmission project (Pattern Energy, 3 GW NM-AZ, commissioning 2026). The named-pipeline HVDC anchor.
- **[NewGrid](https://moreenergycleanplanet.com/ecosystem#company/newgrid)** (commercial) — Grid-enhancing-technology software OEM; topology optimization (dynamic line ratings, switching, contingency analysis) deployed at utilities including AEP. Spinoff from MIT power-systems lab.
- **[Smart Wires](https://moreenergycleanplanet.com/ecosystem#company/smart-wires)** (commercial) — US OEM of modular power-flow control devices (SmartValve series) for advanced grid management. Active deployments across NERC regions; the GETs deployment-scale exemplar.
- **[SPAN](https://moreenergycleanplanet.com/ecosystem#company/span)** (series_c_plus) — Smart electrical panel manufacturer that enables home electrification without expensive panel or utility upgrades, with the SPAN Edge at-the-meter device extending the model to all existing homes via partnerships with PG&E, Eaton, and major utilities.
- **[TS Conductor](https://moreenergycleanplanet.com/ecosystem#company/ts-conductor)** (commercial) — US advanced-conductor manufacturer; proprietary carbon-composite-core ACCC-class conductor operates at higher temperatures with lower sag than ACSR. $134M Huger SC factory groundbreaking 2025; commissioning 2026. The first US-domestic high-volume advanced-conductor plant. Backed by Breakthrough Energy Ventures.

## FAQ

### What exactly is "the grid" in energy terms — is it the same as power generation?

No — the grid is the **delivery system, not generation**. It's the high-voltage transmission lines, distribution lines, substations, transformers, the interconnection queue, rights-of-way, and the regulatory machinery that decides which generator plugs in and when. As the narrative puts it: every clean electron the rest of the pillar produces has to ride a wire to a customer, or it doesn't count.

### Why is the interconnection queue such a bottleneck for new clean energy?

The US has 1,260 GW of installed capacity, but **2,290 GW of new generation + storage is stuck in the queue** — roughly 1.8x the entire existing fleet, and 95 percent of it clean. The median wait from queue entry to commercial operation has roughly doubled to **4.5 years**, and 77 percent of capacity that entered the queue between 2000 and 2019 withdrew before it was ever built.

### Do we have to wait a decade of permitting reform to fix grid capacity, or is there a faster path?

There's a faster path, run on two parallel tracks. **Reconductoring** — swapping old ACSR wire for advanced conductors (carbon-composite-core, aluminum-zirconium alloy) on existing rights-of-way — doubles line capacity in 18 to 36 months at a fraction of greenfield cost. The second track is the named **HVDC pipeline**, 8.75 GW including SunZia, TransWest Express, Champlain Hudson Power Express, and Grain Belt Express Phase 1.

### Why does the grid matter so much to other clean-energy sectors?

Because the grid is the **throughput floor under the entire cascade** — cheap solar electrons that can't reach a customer don't unlock anything. Data centers need transmission to site near power, electrified buildings and transport need distribution upgrades, green hydrogen needs interconnection at low-cost renewable zones, and DAC needs surplus clean power siting. The grid doesn't produce the cost threshold; it's what the threshold gets **delivered** on.

## Charts (embeddable)

- **The crossover puts pressure on the wire.** — https://moreenergycleanplanet.com/embed/the-grid-two-curves (https://moreenergycleanplanet.com/embed/the-grid-two-curves.svg · https://moreenergycleanplanet.com/embed/the-grid-two-curves.png)
- **The Second Grid.** — https://moreenergycleanplanet.com/embed/the-grid-second-grid (https://moreenergycleanplanet.com/embed/the-grid-second-grid.svg · https://moreenergycleanplanet.com/embed/the-grid-second-grid.png)

## Sources

- **lbnl-queued-up-2025** — [Queued Up: 2025 Edition](https://emp.lbl.gov/publications/queued-2025-edition-characteristics) _(primary, report)_
- **doe-transmission-needs-2023** — [National Transmission Needs Study](https://www.energy.gov/gdo/national-transmission-needs-study) _(gov, report)_
- **eia-epa-2024** — [Electric Power Annual 2024](https://www.eia.gov/electricity/annual/pdf/epa.pdf) _(primary, report)_
- **berkeley-gridlab-reconductoring** — [Accelerating transmission capacity expansion by using advanced conductors in existing right-of-way](https://www.pnas.org/doi/10.1073/pnas.2411207121) _(primary, report)_
- **sunzia-hitachi** — [SunZia Wind and Transmission](https://www.hitachienergy.com/us/en/news-and-events/customer-success-stories/sunzia) _(secondary, report)_

## Related sectors

[Bioenergy](https://moreenergycleanplanet.com/sectors/bioenergy.md) · [Coal](https://moreenergycleanplanet.com/sectors/coal.md) · [Data Centers](https://moreenergycleanplanet.com/sectors/data-centers.md) · [Fusion](https://moreenergycleanplanet.com/sectors/fusion.md) · [Geothermal](https://moreenergycleanplanet.com/sectors/geothermal.md) · [Hydro](https://moreenergycleanplanet.com/sectors/hydro.md) · [Natural Gas](https://moreenergycleanplanet.com/sectors/natural-gas.md) · [Nuclear Fission](https://moreenergycleanplanet.com/sectors/nuclear-fission.md) · [Oil](https://moreenergycleanplanet.com/sectors/oil.md) · [Solar](https://moreenergycleanplanet.com/sectors/solar.md) · [Energy Storage](https://moreenergycleanplanet.com/sectors/storage.md) · [Wind](https://moreenergycleanplanet.com/sectors/wind.md)

## Machine access

- Structured data: https://moreenergycleanplanet.com/sectors/the-grid.json
- Live data via MCP: https://mcp.moreenergycleanplanet.com/mcp — tools: get_sector, get_cost_curve, list_indicators, get_sources
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "sector",
  "slug": "the-grid",
  "title": "The Grid",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "status": "live",
  "theme_color": "#FFB627",
  "summary": "Transmission, distribution, and interconnection — the wires and software that move electrons from where they're generated to where they're needed.",
  "analysis": "## What it is: The delivery system. The bottleneck.\n\nThe grid is high-voltage transmission lines, distribution lines, substations, transformers, the interconnection queue, the rights-of-way, the planning processes, and the regulatory machinery that decides which generator gets to plug in and when. It is not generation; it is delivery. Every clean electron the rest of this pillar produces has to ride a wire to a customer or it doesn't count.\n\nToday the US has **1,260 GW** of installed generating capacity (EIA Electric Power Annual 2024). Sitting in the interconnection queue, waiting for a connection it cannot get fast enough, is **2,290 GW** of new generation + storage (LBNL Queued Up 2025) — roughly 1.8x the entire existing fleet, 95 percent of which is clean. Median wait from queue entry to commercial operation has roughly doubled to 4.5 years; 77 percent of capacity that entered the queue between 2000 and 2019 withdrew before it ever got built. The DOE National Transmission Needs Study estimates that meeting clean-energy + high-load growth requires **412 percent** growth in interregional transmission capacity by 2035.\n\nThe bottleneck is solvable, not by waiting a decade for greenfield permitting reform but by riding two parallel tracks at once. Track one: **reconductoring** — replacing aluminum-conductor-steel-reinforced (ACSR) wire with advanced conductors (carbon-composite-core, aluminum-zirconium alloy) on existing rights-of-way doubles line capacity in 18 to 36 months at a fraction of greenfield cost (PNAS, Berkeley GSPP + GridLab, April 2024). Track two: the named **HVDC pipeline** — SunZia (3 GW, commissioning 2026), TransWest Express (3 GW, ops 2031), Champlain Hudson Power Express (1.25 GW, commercial ops May 13, 2026), Grain Belt Express Phase 1 (1.5 GW, federal review restarted January 2026). 8.75 GW named pipeline is the second-grid backbone forming.\n\n## The crossover: The grid is the constraint between the curves.\n\nManufactured energy is cheap. Extractive energy is expensive. Between them sits the grid — the bottleneck the rest of the pillar has to ride through. The chart marks this sector as the delivery layer the crossover demands.\n\n**Figure — Manufactured vs extractive energy curves, with the grid marked as the delivery bottleneck between them.** Interactive chart and accessible data table: [/embed/the-grid-two-curves](/embed/the-grid-two-curves).\n\n## The Second Grid: 2,290 GW vs 1,260 GW. Reconductoring doubles existing lines. HVDC pipeline is 8.75 GW named.\n\nThe chart stacks the three numbers that matter on one axis: the existing fleet, the queue waiting to plug in, and the reconductoring delta available on rights-of-way the country already owns. The Second Grid is not a metaphor — it is the additional throughput the existing wires can carry once advanced conductors replace ACSR, plus the named HVDC pipeline plumbed across the seams that today's three asynchronous grid interconnections leave open.\n\n**Figure — The Second Grid: existing fleet vs interconnection queue vs reconductoring delta on one axis.** Interactive chart and accessible data table: [/embed/the-grid-second-grid](/embed/the-grid-second-grid).\n\n## Technology: Conductors, converter stations, software, the interconnection queue.\n\n**Advanced conductors** — TS Conductor's carbon-composite core, CTC Global's ACCC, Southwire's hybrid alloys — operate at higher temperatures with lower sag than ACSR, doubling line throughput on existing structures. TS Conductor's $134M Huger, South Carolina factory (groundbreaking 2025; commissioning 2026) is the first US-domestic high-volume plant. **HVDC converter stations** — Hitachi Energy (SunZia bipolar 525 kV), Siemens Energy, GE Vernova — convert AC-DC-AC to move bulk power across long distances with lower losses than AC. **Grid-enhancing technologies** (GETs) include dynamic line ratings, topology optimization (NewGrid), advanced power-flow control (Smart Wires). **Grid software** — Aurora Energy Research, GridStatus, PJM's market software, MISO's queue cluster studies — runs the planning, settlement, and reliability layer.\n\nThe interconnection queue is itself a technology problem. FERC Order 2023 (July 2023) replaced first-come-first-served serial studies with cluster studies, batch-processing applicants together — every RTO is filing compliance plans through 2024–2026. PJM, MISO, and ERCOT cluster reforms are at various states of effect. The Order is the regulatory delta the queue is finally bending against.\n\n## Thesis role: Enabling every downstream sector. The throughput floor.\n\nCheap solar electrons that cannot reach a customer don't unlock anything. The grid is the throughput floor under the entire cascade. [Data centers](/sectors/data-centers) need transmission to site near power; [electrified buildings + transport](/sectors/buildings-and-transportation) need distribution upgrades to handle the new load; [green hydrogen](/sectors/green-hydrogen) needs interconnection points at low-cost renewable zones; [DAC](/sectors/dac) needs surplus clean power siting. The grid does not produce the threshold; the grid is what the threshold gets delivered on.\n\n## Policy drivers: FERC Order 2023, IIJA GRIP, IRA transmission credits, state siting reform.\n\n**FERC Order 2023** (July 2023) is the queue reform — cluster studies replace serial, raising the bar for queue entry, batch-processing applicants, with compliance plans filed by every RTO through 2024 to 2026. **FERC Order 1920** (May 2024) is the long-term-planning reform — requires transmission planners to identify needs on 20-year horizons. **IIJA's GRIP program** deploys $10.5 billion over FY22-26 in three rounds; Round 1 awarded $3.46 billion to 58 projects in October 2023; Round 2 awarded $4.2 billion to 46 projects in October 2024; approximately $1 billion in Round-2 awards were cancelled in October 2025 (track per the bugs file). **IRA Section 48E ITC** applies to standalone storage paired with transmission; **DOE LPO** finances anchor transmission lines. State-level permitting reform — Texas SB 6 + ERCOT cluster studies, California AB 205 — is where the action sits below the federal line.",
  "canonical_url": "https://moreenergycleanplanet.com/sectors/the-grid/",
  "markdown_url": "https://moreenergycleanplanet.com/sectors/the-grid.md",
  "json_url": "https://moreenergycleanplanet.com/sectors/the-grid.json",
  "updated_at": "2026-05-28",
  "as_of": "2026-05-28",
  "staleness_window_days": 400,
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "cite_url": "https://moreenergycleanplanet.com/sectors/the-grid.cite",
  "key_claims": [
    {
      "text": "A 2,290 GW interconnection queue against 1,260 GW of total installed capacity means the grid, not generation, is now the binding constraint on adding clean power.",
      "source_id": "lbnl-queued-up-2025"
    },
    {
      "text": "A 4.5-year median wait from interconnection request to operation is the bottleneck that strands cheap generation, making queue reform as decisive as any cost curve.",
      "source_id": "lbnl-queued-up-2025"
    },
    {
      "text": "Reconductoring can roughly double capacity on existing corridors, a faster path than the 412% transmission expansion otherwise needed by 2035 to move the electrons.",
      "source_id": "berkeley-gridlab-reconductoring"
    }
  ],
  "indicators": [
    {
      "id": "us-interconnection-queue-gw",
      "name": "US interconnection queue capacity",
      "value": 2290,
      "unit": "GW",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "P1 delivery indicator. Down 12% YoY from 2024-edition peak — driven by historic withdrawals, NOT by deployment clearing. Gas requests surged +72%. The shrinkage is structural reform pending, not \"interconnection crisis solved.\"",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-interconnection-queue-gw",
      "source_id": "lbnl-queued-up-2025"
    },
    {
      "id": "us-transmission-needs-2035",
      "name": "US transmission expansion needed by 2035 (interregional, high-growth scenario)",
      "value": 412,
      "unit": "% expansion",
      "goal": 412,
      "goal_unit": "% expansion",
      "goal_year": 2035,
      "target_year": 2035,
      "projection": true,
      "as_of": "2023-06-30",
      "staleness_window_days": 540,
      "stale": true,
      "methodology": "P1 delivery indicator. High-growth scenario; the canonical \"more than 2x within / 5x interregional\" public framing maps to 128% / 412%.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035",
      "source_id": "doe-transmission-needs-2023"
    },
    {
      "id": "us-existing-grid-gw",
      "name": "US installed electric generating capacity",
      "value": 1260,
      "unit": "GW",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 1,260 GW US existing | EIA EPA 2024. Queue is ~1.8x the entire existing fleet.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-existing-grid-gw",
      "source_id": "eia-epa-2024"
    },
    {
      "id": "reconductoring-throughput-gain",
      "name": "Reconductoring capacity-gain potential on existing corridors",
      "value": 2,
      "unit": "x multiplier",
      "goal": 2,
      "goal_unit": "x multiplier",
      "goal_year": 2035,
      "target_year": 2035,
      "as_of": "2024-04-09",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 2x line capacity | Berkeley/GridLab PNAS Apr 2024.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/reconductoring-throughput-gain",
      "source_id": "berkeley-gridlab-reconductoring"
    },
    {
      "id": "hvdc-projects-pipeline-gw",
      "name": "Major US HVDC inter-grid project pipeline",
      "value": 8.75,
      "unit": "GW",
      "goal": null,
      "goal_year": null,
      "as_of": "2026-05-28",
      "staleness_window_days": 400,
      "stale": false,
      "methodology": "display: 8.75 GW named HVDC pipeline | SunZia + TransWest + CHPE + GBX. The Second Grid backbone.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/hvdc-projects-pipeline-gw",
      "source_id": "sunzia-hitachi"
    },
    {
      "id": "interconnection-queue-wait-years",
      "name": "Median time, interconnection request to commercial operation",
      "value": 4.5,
      "unit": "years",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 4.5 years median wait | LBNL Queued Up 2025. The bottleneck quantified.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/interconnection-queue-wait-years",
      "source_id": "lbnl-queued-up-2025"
    }
  ],
  "cost_curve": null,
  "companies": [
    {
      "id": "ampere",
      "name": "Ampere",
      "stage": "seed",
      "one_line_description": "Software platform automating large-load interconnection studies and grid services applications, addressing the multi-year queue delays that constrain data center, electrolyzer, and industrial electrification projects.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/ampere"
    },
    {
      "id": "base-power",
      "name": "Base Power",
      "stage": "series_c",
      "one_line_description": "Texas residential battery operator selling fixed-rate home electricity with included whole-home backup battery, then aggregating thousands of homes into a virtual power plant participating in ERCOT markets, expanding nationally with $1B Series C.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/base-power"
    },
    {
      "id": "ctc-global",
      "name": "CTC Global",
      "stage": "commercial",
      "one_line_description": "US advanced-conductor OEM; ACCC (Aluminum Conductor Composite Core) deployed at scale across US utilities. ~100K km cumulative deployment globally; mature deployment record with named US transmission projects.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/ctc-global"
    },
    {
      "id": "entergy-louisiana",
      "name": "Entergy Louisiana",
      "stage": "commercial",
      "one_line_description": "Regulated utility building the initial generation and grid package for Meta Hyperion, including about 2,262 MW of gas generation and procurement for up to 1,500 MW of solar.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/entergy-louisiana"
    },
    {
      "id": "gridstatus",
      "name": "GridStatus.io",
      "stage": "commercial",
      "one_line_description": "Public ISO/RTO grid-data platform; standardized real-time API + dashboards across PJM, MISO, ERCOT, CAISO, NYISO, ISO-NE, SPP. The analyst-facing transparency layer used by traders, researchers, journalists.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/gridstatus"
    },
    {
      "id": "hitachi-energy",
      "name": "Hitachi Energy",
      "stage": "commercial",
      "one_line_description": "Global HVDC + power-equipment OEM (Hitachi-ABB Power Grids JV formed 2020; renamed Hitachi Energy 2021). Bipolar 525 kV HVDC for SunZia transmission project (Pattern Energy, 3 GW NM-AZ, commissioning 2026). The named-pipeline HVDC anchor.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/hitachi-energy"
    },
    {
      "id": "newgrid",
      "name": "NewGrid",
      "stage": "commercial",
      "one_line_description": "Grid-enhancing-technology software OEM; topology optimization (dynamic line ratings, switching, contingency analysis) deployed at utilities including AEP. Spinoff from MIT power-systems lab.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/newgrid"
    },
    {
      "id": "smart-wires",
      "name": "Smart Wires",
      "stage": "commercial",
      "one_line_description": "US OEM of modular power-flow control devices (SmartValve series) for advanced grid management. Active deployments across NERC regions; the GETs deployment-scale exemplar.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/smart-wires"
    },
    {
      "id": "span",
      "name": "SPAN",
      "stage": "series_c_plus",
      "one_line_description": "Smart electrical panel manufacturer that enables home electrification without expensive panel or utility upgrades, with the SPAN Edge at-the-meter device extending the model to all existing homes via partnerships with PG&E, Eaton, and major utilities.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/span"
    },
    {
      "id": "ts-conductor",
      "name": "TS Conductor",
      "stage": "commercial",
      "one_line_description": "US advanced-conductor manufacturer; proprietary carbon-composite-core ACCC-class conductor operates at higher temperatures with lower sag than ACSR. $134M Huger SC factory groundbreaking 2025; commissioning 2026. The first US-domestic high-volume advanced-conductor plant. Backed by Breakthrough Energy Ventures.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/ts-conductor"
    }
  ],
  "faqs": [
    {
      "question": "What exactly is \"the grid\" in energy terms — is it the same as power generation?",
      "answer_md": "No — the grid is the **delivery system, not generation**. It's the high-voltage transmission lines, distribution lines, substations, transformers, the interconnection queue, rights-of-way, and the regulatory machinery that decides which generator plugs in and when. As the narrative puts it: every clean electron the rest of the pillar produces has to ride a wire to a customer, or it doesn't count.",
      "source_id": null
    },
    {
      "question": "Why is the interconnection queue such a bottleneck for new clean energy?",
      "answer_md": "The US has 1,260 GW of installed capacity, but **2,290 GW of new generation + storage is stuck in the queue** — roughly 1.8x the entire existing fleet, and 95 percent of it clean. The median wait from queue entry to commercial operation has roughly doubled to **4.5 years**, and 77 percent of capacity that entered the queue between 2000 and 2019 withdrew before it was ever built.",
      "source_id": null
    },
    {
      "question": "Do we have to wait a decade of permitting reform to fix grid capacity, or is there a faster path?",
      "answer_md": "There's a faster path, run on two parallel tracks. **Reconductoring** — swapping old ACSR wire for advanced conductors (carbon-composite-core, aluminum-zirconium alloy) on existing rights-of-way — doubles line capacity in 18 to 36 months at a fraction of greenfield cost. The second track is the named **HVDC pipeline**, 8.75 GW including SunZia, TransWest Express, Champlain Hudson Power Express, and Grain Belt Express Phase 1.",
      "source_id": null
    },
    {
      "question": "Why does the grid matter so much to other clean-energy sectors?",
      "answer_md": "Because the grid is the **throughput floor under the entire cascade** — cheap solar electrons that can't reach a customer don't unlock anything. Data centers need transmission to site near power, electrified buildings and transport need distribution upgrades, green hydrogen needs interconnection at low-cost renewable zones, and DAC needs surplus clean power siting. The grid doesn't produce the cost threshold; it's what the threshold gets **delivered** on.",
      "source_id": null
    }
  ],
  "related_sectors": [
    {
      "slug": "bioenergy",
      "title": "Bioenergy"
    },
    {
      "slug": "coal",
      "title": "Coal"
    },
    {
      "slug": "data-centers",
      "title": "Data Centers"
    },
    {
      "slug": "fusion",
      "title": "Fusion"
    },
    {
      "slug": "geothermal",
      "title": "Geothermal"
    },
    {
      "slug": "hydro",
      "title": "Hydro"
    },
    {
      "slug": "natural-gas",
      "title": "Natural Gas"
    },
    {
      "slug": "nuclear-fission",
      "title": "Nuclear Fission"
    },
    {
      "slug": "oil",
      "title": "Oil"
    },
    {
      "slug": "solar",
      "title": "Solar"
    },
    {
      "slug": "storage",
      "title": "Energy Storage"
    },
    {
      "slug": "wind",
      "title": "Wind"
    }
  ],
  "embeds": [
    {
      "id": "the-grid-two-curves",
      "title": "The crossover puts pressure on the wire.",
      "permalink": "https://moreenergycleanplanet.com/embed/the-grid-two-curves",
      "svg": "https://moreenergycleanplanet.com/embed/the-grid-two-curves.svg",
      "png": "https://moreenergycleanplanet.com/embed/the-grid-two-curves.png"
    },
    {
      "id": "the-grid-second-grid",
      "title": "The Second Grid.",
      "permalink": "https://moreenergycleanplanet.com/embed/the-grid-second-grid",
      "svg": "https://moreenergycleanplanet.com/embed/the-grid-second-grid.svg",
      "png": "https://moreenergycleanplanet.com/embed/the-grid-second-grid.png"
    }
  ],
  "sources": [
    {
      "id": "lbnl-queued-up-2025",
      "title": "Queued Up: 2025 Edition",
      "url": "https://emp.lbl.gov/publications/queued-2025-edition-characteristics",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Latest LBNL queue snapshot (year-end 2024): ~1,400 GW generation + ~890 GW storage = ~2,290 GW active. SUPERSEDES the prior 2,600 GW figure from the 2024 Edition. Decline driven by historic withdrawals + gas requests +72%, not by clearing."
    },
    {
      "id": "doe-transmission-needs-2023",
      "title": "National Transmission Needs Study",
      "url": "https://www.energy.gov/gdo/national-transmission-needs-study",
      "publisher_tier": "gov",
      "source_type": "report",
      "note": "fn98 grid as largest machine framing; fn100 double regional / 5x interregional transmission by 2035."
    },
    {
      "id": "eia-epa-2024",
      "title": "Electric Power Annual 2024",
      "url": "https://www.eia.gov/electricity/annual/pdf/epa.pdf",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "1,260 GW total US generating capacity; +48.6 GW added 2024."
    },
    {
      "id": "berkeley-gridlab-reconductoring",
      "title": "Accelerating transmission capacity expansion by using advanced conductors in existing right-of-way",
      "url": "https://www.pnas.org/doi/10.1073/pnas.2411207121",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Advanced conductors quadruple new interzonal capacity by 2035 at +20% cost vs greenfield-only."
    },
    {
      "id": "sunzia-hitachi",
      "title": "SunZia Wind and Transmission",
      "url": "https://www.hitachienergy.com/us/en/news-and-events/customer-success-stories/sunzia",
      "publisher_tier": "secondary",
      "source_type": "report",
      "note": "525 kV bipolar HVDC, 3 GW, 553 mi NM-AZ. Commissioning 2026."
    }
  ],