# Nuclear Fission

> Gigawatt-scale plants and the new generation of small modular and microreactors designed for factory production. Radiant, Oklo, Aalo Atomics, and the hyperscaler offtake agreements pulling the supply chain back into existence.

**Pillar:** [Energy Production](https://moreenergycleanplanet.com/sectors/energy-production) · **Status:** live · **As of:** 2026-05-01

## Key claims

- The existing US fleet runs at a 92.7% capacity factor and a $30/MWh marginal cost, so the cheapest clean firm power on the grid is the reactors already built. _(2024 Annual Technology Baseline — Nuclear)_
- Vogtle's 2.5x cost overrun is the central problem fission must solve: new-build economics, not physics, are why nuclear sits at 18.8% of US generation and not higher. _(Vogtle Unit 4 begins commercial operation, completing nuclear expansion)_
- Hyperscaler offtake and 9 reactor applications under active NRC review are pulling a dormant supply chain back into existence around factory-built small and microreactors. _(New Reactor Applications)_

## Analysis

Gigawatt-scale plants and the new generation of small modular and microreactors designed for factory production. Radiant, Oklo, Aalo Atomics, and the hyperscaler offtake agreements pulling the supply chain back into existence.

### What it is: The firm-clean spine.

Nuclear fission splits heavy atomic nuclei (uranium-235 or plutonium-239) to release heat, which boils water or working fluid to drive steam turbines. The technology has been deployed commercially in the United States since 1957; the US installed nuclear fleet is **95 GW across 54 reactors at 32 plants** (EIA Electric Power Annual 2024). Nuclear generated **18.8% of US electricity** in 2024 — the single largest clean-electricity source, exceeding wind + solar combined.

The fleet operates at **92.7% capacity factor** (EIA EPA 2024) — the highest of any generation source — meaning 24/7 baseload availability that variable solar (25%) and wind (35%) cannot deliver alone. Existing-fleet marginal cost is **$30/MWh** (NREL ATB 2024), making nuclear the cheapest firm-clean generation in the US system. The hyperscaler PPA wave (Constellation/Microsoft at Three Mile Island; Talen/AWS at Susquehanna; Vistra/AWS at Comanche Peak) is driven by that combination — firm + clean + extant.

New-build conventional nuclear is expensive and slow. **Vogtle Units 3 and 4** (the only new US conventional nuclear build this century) came in at **$36.8B total — 2.6x the initial $14.3B estimate** (EIA TIE 61927), 7 years late. That is the cautionary baseline. The Small Modular Reactor (SMR) pipeline — Kairos Power, Oklo, X-energy, NuScale, GE-Hitachi BWRX-300, Holtec SMR-300 — proposes factory-fabricated modular construction targeting $60-110/MWh by the 2030s, with **9 NRC applications under active review**.

### The crossover: Below both curves. The firm floor.

Nuclear is annotated on the chart as the firm-clean incumbent — fuel cost is negligible (uranium is ~5% of the busbar cost), so it doesn't ride the extractive up-curve; deployment is small + slow + expensive at new-build, so it doesn't ride the manufactured down-curve. It sits below both curves as the firm baseload the variable build relies on.

**Figure — Energy Production two curves: Wright's-law manufactured down-curve vs extractive up-curve, with nuclear annotated as the firm-clean incumbent below both.** Interactive chart and accessible data table: [/embed/nuclear-fission-two-curves](/embed/nuclear-fission-two-curves).

### Firm role: 92.7% capacity factor — highest of any source.

Nuclear's 92.7% fleet-average CF is the highest of any US generation source. Compared to gas combined-cycle (57%), coal (42%), hydro (37%), wind (35%), and solar (25%), nuclear is the only category that runs at near-100% availability around the year. The residual 7.3% is refueling outages (typically every 18-24 months for 30-45 days).

**Figure — Capacity factor by US generation source: nuclear 92.7% vs gas CC 57%, coal 42%, hydro 37%, wind 35%, solar 25%.** Interactive chart and accessible data table: [/embed/nuclear-fission-firm-role](/embed/nuclear-fission-firm-role).

### Technology: Conventional LWR fleet + restart + SMR pipeline + advanced reactor.

The US fleet is light-water reactors (LWR — boiling-water + pressurized-water), 950-1300 MW each. **Westinghouse AP1000** + **GE-Hitachi BWRX-300** are the dominant active conventional + new-LWR designs. Restart activity is the recent surge: **Three Mile Island Unit 1** (Constellation + Microsoft 20-year PPA, targeting 2028); **Palisades** (Holtec, $1.52B DOE LPO loan Sep 2024, targeting 2025); **Duane Arnold** (NextEra, in study).

The **SMR pipeline** proposes factory-fabricated modular construction across multiple chemistries: **Kairos Power** (fluoride-salt-cooled high-temperature; Hermes demonstration under construction in Oak Ridge TN); **Oklo** (Aurora liquid-metal-cooled microreactor); **X-energy** (Xe-100 HTGR with Dow + Energy Northwest first deployments); **NuScale** (light-water 77 MWe modules); **Holtec SMR-300**. **TerraPower Natrium** (Kemmerer WY non-nuclear construction since 2024) is the advanced-reactor entry — sodium-cooled fast reactor with integrated molten-salt storage.

### Thesis role: Firm-clean balancer. The hyperscaler anchor.

Below two cents per kilowatt-hour, solar + [storage](/sectors/storage) become the daytime + short-duration backbone. Multi-day + seasonal + winter-peak balancing still needs firm-clean dispatch. Nuclear is the largest installed source of that, with [hydro](/sectors/hydro), [geothermal](/sectors/geothermal), and [fusion](/sectors/fusion) (when it ships) the other firm-clean slots. [Hyperscaler PPAs](/sectors/data-centers) are the most concentrated forward demand signal anywhere in the energy economy. Nuclear meets that demand profile better than any alternative the year a hyperscaler is signing a 15-20 year PPA.

### Policy drivers: NRC, IRA Civil Nuclear Credit, DOE ARDP, DOE LPO restart loans.

**Nuclear Regulatory Commission (NRC)** governs construction-permit + operating-license review. **IRA Section 45U Civil Nuclear Credit** ($15/MWh ceiling for existing reactors) prevented the late-2020s wave of merchant-fleet retirements. **DOE Advanced Reactor Demonstration Program (ARDP)** cost-shares first-of-a-kind builds (TerraPower Natrium + X-energy Xe-100). **DOE Loan Programs Office** finances restarts (Palisades $1.52B Sep 2024) + advanced-reactor builds. **Inflation Reduction Act Section 45Y/48E** applies the clean-electricity PTC + ITC to qualifying new nuclear. The **ADVANCE Act** (signed Jul 2024) modernizes NRC licensing for advanced reactors + cuts fees.

## Data

| indicator | value | goal (year) | as of | source |
|---|---|---|---|---|
| US installed nuclear capacity | 95 GW ⚠ stale | 100 GW (2030) | 2024-12-31 | Electric Power Annual 2024 |
| Nuclear share of US electricity generation | 18.8 % ⚠ stale | — | 2024-12-31 | Electricity Monthly (Mar 2025 release) |
| US nuclear capacity factor (fleet average) | 92.7 % ⚠ stale | — | 2024-12-31 | Electric Power Annual 2024 |
| Existing US nuclear fleet LCOE (marginal) | 30 USD/MWh ⚠ stale | — | 2024-12-31 | 2024 Annual Technology Baseline — Nuclear |
| NRC reactor applications under active review | 9 count | — | 2026-05-01 | New Reactor Applications |
| Vogtle Units 3-4 cost overrun factor (final vs initial estimate) | 2.5 x multiplier ⚠ stale | — | 2024-04-29 | Vogtle Unit 4 begins commercial operation, completing nuclear expansion |

## Companies

- **[Aalo Atomics](https://moreenergycleanplanet.com/ecosystem#company/aalo-atomics)** (series_b) — Builds 50 MW Aalo Pods (five 10 MW Aalo-1 sodium-cooled microreactors per pod) purpose-built for AI data center colocation, with the experimental Aalo-X targeting criticality at Idaho National Lab by July 4 2026.
- **[GE Hitachi Nuclear Energy](https://moreenergycleanplanet.com/ecosystem#company/ge-hitachi-nuclear)** (foak) — US-Japan nuclear JV (now GE Vernova subsidiary NYSE:GEV); BWRX-300 small modular reactor (~300 MWe boiling-water). Ontario Power Generation Darlington New Nuclear first-of-a-kind in Canada (construction permit Aug 2024; targeting late-2020s ops). TVA Clinch River, Synthos Green Energy (Poland) follow-ons.
- **[Holtec International](https://moreenergycleanplanet.com/ecosystem#company/holtec-international)** (foak) — US privately-held nuclear technology developer. SMR-300 (formerly SMR-160) light-water SMR; Palisades restart contract (~MI; first US nuclear plant restart with $1.52B DOE LPO loan Sep 2024; targeting 2025 ops). Largest US dry-cask-storage + decommissioning vendor.
- **[Kairos Power](https://moreenergycleanplanet.com/ecosystem#company/kairos-power)** (growth) — Developer of fluoride salt-cooled high-temperature pebble-bed nuclear reactors using TRISO fuel, with the Hermes demonstration reactor under construction in Oak Ridge and a 500 MW master agreement with Google.
- **[Last Energy](https://moreenergycleanplanet.com/ecosystem#company/last-energy)** (foak) — US distributed-nuclear startup; 20 MWe modular plug-and-play microreactor for industrial off-takers. UK + Poland + Romania development pipeline; bypasses traditional grid-scale licensing path. Founded by Bret Kugelmass.
- **[NuScale Power](https://moreenergycleanplanet.com/ecosystem#company/nuscale-power)** (foak) — US light-water SMR developer (NYSE: SMR). 77 MWe modules; up to 12 modules per plant. First NRC-certified SMR design (Aug 2022). UAMPS Carbon Free Power Project cancelled Nov 2023 — restructured pipeline now focuses on RoPower Romania + Standard Power Ohio + KEPCO Korea.
- **[Oklo](https://moreenergycleanplanet.com/ecosystem#company/oklo)** (public) — Public advanced fission developer building the Aurora Powerhouse, a 15-75 MW liquid-metal-cooled fast reactor with a ~14 GW non-binding pipeline targeting AI data centers, with Atomic Alchemy subsidiary targeting first criticality by July 4 2026.
- **[Radiant Industries](https://moreenergycleanplanet.com/ecosystem#company/radiant-nuclear)** (series_d) — Builds the 1 MW Kaleidos portable nuclear microreactor that ships by truck to replace diesel generators at military bases, remote industry, hospitals, and data centers, with first criticality at Idaho National Lab targeted for summer 2026.
- **[TerraPower](https://moreenergycleanplanet.com/ecosystem#company/terrapower)** (foak) — US advanced-reactor developer (Bill Gates + Khosla Ventures backed). Natrium sodium-cooled fast reactor with integrated molten-salt storage; 345 MWe + 500 MWe peaking. Kemmerer WY first-of-a-kind under construction since 2024 (non-nuclear systems first; targeting 2030 ops). DOE ARDP $2B cost-share.
- **[Westinghouse Electric](https://moreenergycleanplanet.com/ecosystem#company/westinghouse-electric)** (commercial) — US nuclear reactor + fuel OEM (Brookfield + Cameco owned since Sep 2023 $7.875B acquisition). AP1000 conventional LWR (deployed at Vogtle 3-4 + China Sanmen/Haiyang); AP300 SMR derivative announced May 2023. Largest US nuclear-fuel supplier.
- **[X-energy](https://moreenergycleanplanet.com/ecosystem#company/x-energy)** (public) — Developer of high-temperature gas-cooled small modular reactors using TRISO ceramic fuel pebbles, with first commercial deployment at Dow's Seadrift Texas petrochemical site under DOE's Advanced Reactor Demonstration Program.

## FAQ

### What makes nuclear the cheapest firm-clean power in the US?

The existing US fleet runs at a **$30/MWh** marginal cost (NREL ATB 2024), the cheapest firm-clean generation in the system, because fuel is negligible — uranium is only ~5% of the busbar cost. That low fuel exposure means nuclear doesn't ride the extractive cost up-curve. Combined with 24/7 availability, it sits below both the manufactured down-curve and the extractive up-curve as the firm floor the variable build relies on.

### Why do nuclear plants run almost all the time when solar and wind don't?

Nuclear's fleet-average **92.7% capacity factor** (EIA EPA 2024) is the highest of any US generation source, versus gas combined-cycle at 57%, coal 42%, hydro 37%, wind 35%, and solar 25%. The residual 7.3% downtime is refueling outages, typically every 18-24 months for 30-45 days. That near-100% year-round availability is the baseload variable solar and wind cannot deliver alone.

### Is new nuclear actually cheap, or just the existing plants?

It's the *existing* fleet that's cheap at $30/MWh — new conventional builds are expensive and slow. **Vogtle Units 3 and 4**, the only new US conventional build this century, came in at **$36.8B total, 2.6x the initial $14.3B estimate** and 7 years late (EIA TIE 61927). The Small Modular Reactor pipeline (Kairos, Oklo, X-energy, NuScale and others) proposes factory-fabricated modular construction targeting $60-110/MWh by the 2030s, with 9 NRC applications under active review.

### Why are companies like Microsoft and Amazon signing deals for nuclear power?

The hyperscaler PPA wave (Constellation/Microsoft at Three Mile Island, Talen/AWS at Susquehanna, Vistra/AWS at Comanche Peak) is driven by nuclear being **firm + clean + extant** all at once. Hyperscaler PPAs are the most concentrated forward demand signal anywhere in the energy economy, and nuclear meets that 24/7 demand profile better than any alternative the year a hyperscaler signs a 15-20 year contract. Nuclear already generates 18.8% of US electricity — the single largest clean-electricity source, exceeding wind plus solar combined.

## Charts (embeddable)

- **Nuclear: clean-firm incumbent below the curves.** — https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves (https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves.svg · https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves.png)
- **Nuclear capacity factor: 92.7%.** — https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role (https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role.svg · https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role.png)

## Sources

- **eia-epa-2024** — [Electric Power Annual 2024](https://www.eia.gov/electricity/annual/pdf/epa.pdf) _(primary, report)_
- **eia-electricity-monthly-2025** — [Electricity Monthly (Mar 2025 release)](https://www.eia.gov/electricity/monthly/) _(primary, report)_
- **nrel-atb-2024-nuclear** — [2024 Annual Technology Baseline — Nuclear](https://atb.nrel.gov/electricity/2024/nuclear) _(primary, report)_
- **nrc-new-reactors** — [New Reactor Applications](https://www.nrc.gov/reactors/new-reactors.html) _(primary, report)_
- **eia-tie-61927** — [Vogtle Unit 4 begins commercial operation, completing nuclear expansion](https://www.eia.gov/todayinenergy/detail.php?id=61927) _(primary, report)_

## Related sectors

[Bioenergy](https://moreenergycleanplanet.com/sectors/bioenergy.md) · [Coal](https://moreenergycleanplanet.com/sectors/coal.md) · [Data Centers](https://moreenergycleanplanet.com/sectors/data-centers.md) · [Fusion](https://moreenergycleanplanet.com/sectors/fusion.md) · [Geothermal](https://moreenergycleanplanet.com/sectors/geothermal.md) · [Hydro](https://moreenergycleanplanet.com/sectors/hydro.md) · [Natural Gas](https://moreenergycleanplanet.com/sectors/natural-gas.md) · [Oil](https://moreenergycleanplanet.com/sectors/oil.md) · [Solar](https://moreenergycleanplanet.com/sectors/solar.md) · [Energy Storage](https://moreenergycleanplanet.com/sectors/storage.md) · [The Grid](https://moreenergycleanplanet.com/sectors/the-grid.md) · [Wind](https://moreenergycleanplanet.com/sectors/wind.md)

## Machine access

- Structured data: https://moreenergycleanplanet.com/sectors/nuclear-fission.json
- Live data via MCP: https://mcp.moreenergycleanplanet.com/mcp — tools: get_sector, get_cost_curve, list_indicators, get_sources
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "sector",
  "slug": "nuclear-fission",
  "title": "Nuclear Fission",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "status": "live",
  "theme_color": "#FFB627",
  "summary": "Gigawatt-scale plants and the new generation of small modular and microreactors designed for factory production. Radiant, Oklo, Aalo Atomics, and the hyperscaler offtake agreements pulling the supply chain back into existence.",
  "analysis": "## What it is: The firm-clean spine.\n\nNuclear fission splits heavy atomic nuclei (uranium-235 or plutonium-239) to release heat, which boils water or working fluid to drive steam turbines. The technology has been deployed commercially in the United States since 1957; the US installed nuclear fleet is **95 GW across 54 reactors at 32 plants** (EIA Electric Power Annual 2024). Nuclear generated **18.8% of US electricity** in 2024 — the single largest clean-electricity source, exceeding wind + solar combined.\n\nThe fleet operates at **92.7% capacity factor** (EIA EPA 2024) — the highest of any generation source — meaning 24/7 baseload availability that variable solar (25%) and wind (35%) cannot deliver alone. Existing-fleet marginal cost is **$30/MWh** (NREL ATB 2024), making nuclear the cheapest firm-clean generation in the US system. The hyperscaler PPA wave (Constellation/Microsoft at Three Mile Island; Talen/AWS at Susquehanna; Vistra/AWS at Comanche Peak) is driven by that combination — firm + clean + extant.\n\nNew-build conventional nuclear is expensive and slow. **Vogtle Units 3 and 4** (the only new US conventional nuclear build this century) came in at **$36.8B total — 2.6x the initial $14.3B estimate** (EIA TIE 61927), 7 years late. That is the cautionary baseline. The Small Modular Reactor (SMR) pipeline — Kairos Power, Oklo, X-energy, NuScale, GE-Hitachi BWRX-300, Holtec SMR-300 — proposes factory-fabricated modular construction targeting $60-110/MWh by the 2030s, with **9 NRC applications under active review**.\n\n## The crossover: Below both curves. The firm floor.\n\nNuclear is annotated on the chart as the firm-clean incumbent — fuel cost is negligible (uranium is ~5% of the busbar cost), so it doesn't ride the extractive up-curve; deployment is small + slow + expensive at new-build, so it doesn't ride the manufactured down-curve. It sits below both curves as the firm baseload the variable build relies on.\n\n**Figure — Energy Production two curves: Wright's-law manufactured down-curve vs extractive up-curve, with nuclear annotated as the firm-clean incumbent below both.** Interactive chart and accessible data table: [/embed/nuclear-fission-two-curves](/embed/nuclear-fission-two-curves).\n\n## Firm role: 92.7% capacity factor — highest of any source.\n\nNuclear's 92.7% fleet-average CF is the highest of any US generation source. Compared to gas combined-cycle (57%), coal (42%), hydro (37%), wind (35%), and solar (25%), nuclear is the only category that runs at near-100% availability around the year. The residual 7.3% is refueling outages (typically every 18-24 months for 30-45 days).\n\n**Figure — Capacity factor by US generation source: nuclear 92.7% vs gas CC 57%, coal 42%, hydro 37%, wind 35%, solar 25%.** Interactive chart and accessible data table: [/embed/nuclear-fission-firm-role](/embed/nuclear-fission-firm-role).\n\n## Technology: Conventional LWR fleet + restart + SMR pipeline + advanced reactor.\n\nThe US fleet is light-water reactors (LWR — boiling-water + pressurized-water), 950-1300 MW each. **Westinghouse AP1000** + **GE-Hitachi BWRX-300** are the dominant active conventional + new-LWR designs. Restart activity is the recent surge: **Three Mile Island Unit 1** (Constellation + Microsoft 20-year PPA, targeting 2028); **Palisades** (Holtec, $1.52B DOE LPO loan Sep 2024, targeting 2025); **Duane Arnold** (NextEra, in study).\n\nThe **SMR pipeline** proposes factory-fabricated modular construction across multiple chemistries: **Kairos Power** (fluoride-salt-cooled high-temperature; Hermes demonstration under construction in Oak Ridge TN); **Oklo** (Aurora liquid-metal-cooled microreactor); **X-energy** (Xe-100 HTGR with Dow + Energy Northwest first deployments); **NuScale** (light-water 77 MWe modules); **Holtec SMR-300**. **TerraPower Natrium** (Kemmerer WY non-nuclear construction since 2024) is the advanced-reactor entry — sodium-cooled fast reactor with integrated molten-salt storage.\n\n## Thesis role: Firm-clean balancer. The hyperscaler anchor.\n\nBelow two cents per kilowatt-hour, solar + [storage](/sectors/storage) become the daytime + short-duration backbone. Multi-day + seasonal + winter-peak balancing still needs firm-clean dispatch. Nuclear is the largest installed source of that, with [hydro](/sectors/hydro), [geothermal](/sectors/geothermal), and [fusion](/sectors/fusion) (when it ships) the other firm-clean slots. [Hyperscaler PPAs](/sectors/data-centers) are the most concentrated forward demand signal anywhere in the energy economy. Nuclear meets that demand profile better than any alternative the year a hyperscaler is signing a 15-20 year PPA.\n\n## Policy drivers: NRC, IRA Civil Nuclear Credit, DOE ARDP, DOE LPO restart loans.\n\n**Nuclear Regulatory Commission (NRC)** governs construction-permit + operating-license review. **IRA Section 45U Civil Nuclear Credit** ($15/MWh ceiling for existing reactors) prevented the late-2020s wave of merchant-fleet retirements. **DOE Advanced Reactor Demonstration Program (ARDP)** cost-shares first-of-a-kind builds (TerraPower Natrium + X-energy Xe-100). **DOE Loan Programs Office** finances restarts (Palisades $1.52B Sep 2024) + advanced-reactor builds. **Inflation Reduction Act Section 45Y/48E** applies the clean-electricity PTC + ITC to qualifying new nuclear. The **ADVANCE Act** (signed Jul 2024) modernizes NRC licensing for advanced reactors + cuts fees.",
  "canonical_url": "https://moreenergycleanplanet.com/sectors/nuclear-fission/",
  "markdown_url": "https://moreenergycleanplanet.com/sectors/nuclear-fission.md",
  "json_url": "https://moreenergycleanplanet.com/sectors/nuclear-fission.json",
  "updated_at": "2026-05-01",
  "as_of": "2026-05-01",
  "staleness_window_days": 400,
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "cite_url": "https://moreenergycleanplanet.com/sectors/nuclear-fission.cite",
  "key_claims": [
    {
      "text": "The existing US fleet runs at a 92.7% capacity factor and a $30/MWh marginal cost, so the cheapest clean firm power on the grid is the reactors already built.",
      "source_id": "nrel-atb-2024-nuclear"
    },
    {
      "text": "Vogtle's 2.5x cost overrun is the central problem fission must solve: new-build economics, not physics, are why nuclear sits at 18.8% of US generation and not higher.",
      "source_id": "eia-tie-61927"
    },
    {
      "text": "Hyperscaler offtake and 9 reactor applications under active NRC review are pulling a dormant supply chain back into existence around factory-built small and microreactors.",
      "source_id": "nrc-new-reactors"
    }
  ],
  "indicators": [
    {
      "id": "nuclear-installed-capacity-us",
      "name": "US installed nuclear capacity",
      "value": 95,
      "unit": "GW",
      "goal": 100,
      "goal_unit": "GW",
      "goal_year": 2030,
      "target_year": 2030,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 95 GW US (2024) | EIA EPA 2024. Largest installed clean-power source by generation.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-installed-capacity-us",
      "source_id": "eia-epa-2024"
    },
    {
      "id": "nuclear-share-us-generation",
      "name": "Nuclear share of US electricity generation",
      "value": 18.8,
      "unit": "%",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 18.8% (US generation 2024) | EIA EM; largest US clean-electricity source.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-share-us-generation",
      "source_id": "eia-electricity-monthly-2025"
    },
    {
      "id": "nuclear-capacity-factor-us",
      "name": "US nuclear capacity factor (fleet average)",
      "value": 92.7,
      "unit": "%",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 92.7% (US fleet avg) | EIA EPA 2024; highest of any US source.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-capacity-factor-us",
      "source_id": "eia-epa-2024"
    },
    {
      "id": "nuclear-lcoe-existing-fleet",
      "name": "Existing US nuclear fleet LCOE (marginal)",
      "value": 30,
      "unit": "USD/MWh",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: $30/MWh (existing fleet) | NREL ATB 2024; cheapest US firm-clean generation.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-lcoe-existing-fleet",
      "source_id": "nrel-atb-2024-nuclear"
    },
    {
      "id": "nuclear-new-reactor-pipeline",
      "name": "NRC reactor applications under active review",
      "value": 9,
      "unit": "count",
      "goal": null,
      "goal_year": null,
      "as_of": "2026-05-01",
      "staleness_window_days": 400,
      "stale": false,
      "methodology": "display: 9 active NRC applications (May 2026) | NRC; SMR pipeline materializing.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-new-reactor-pipeline",
      "source_id": "nrc-new-reactors"
    },
    {
      "id": "nuclear-vogtle-cost-overrun-factor",
      "name": "Vogtle Units 3-4 cost overrun factor (final vs initial estimate)",
      "value": 2.5,
      "unit": "x multiplier",
      "goal": null,
      "goal_year": null,
      "as_of": "2024-04-29",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "display: 2.5x (Vogtle 3-4 vs initial estimate) | EIA TIE 61927.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor",
      "source_id": "eia-tie-61927"
    }
  ],
  "cost_curve": null,
  "companies": [
    {
      "id": "aalo-atomics",
      "name": "Aalo Atomics",
      "stage": "series_b",
      "one_line_description": "Builds 50 MW Aalo Pods (five 10 MW Aalo-1 sodium-cooled microreactors per pod) purpose-built for AI data center colocation, with the experimental Aalo-X targeting criticality at Idaho National Lab by July 4 2026.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/aalo-atomics"
    },
    {
      "id": "ge-hitachi-nuclear",
      "name": "GE Hitachi Nuclear Energy",
      "stage": "foak",
      "one_line_description": "US-Japan nuclear JV (now GE Vernova subsidiary NYSE:GEV); BWRX-300 small modular reactor (~300 MWe boiling-water). Ontario Power Generation Darlington New Nuclear first-of-a-kind in Canada (construction permit Aug 2024; targeting late-2020s ops). TVA Clinch River, Synthos Green Energy (Poland) follow-ons.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/ge-hitachi-nuclear"
    },
    {
      "id": "holtec-international",
      "name": "Holtec International",
      "stage": "foak",
      "one_line_description": "US privately-held nuclear technology developer. SMR-300 (formerly SMR-160) light-water SMR; Palisades restart contract (~MI; first US nuclear plant restart with $1.52B DOE LPO loan Sep 2024; targeting 2025 ops). Largest US dry-cask-storage + decommissioning vendor.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/holtec-international"
    },
    {
      "id": "kairos-power",
      "name": "Kairos Power",
      "stage": "growth",
      "one_line_description": "Developer of fluoride salt-cooled high-temperature pebble-bed nuclear reactors using TRISO fuel, with the Hermes demonstration reactor under construction in Oak Ridge and a 500 MW master agreement with Google.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/kairos-power"
    },
    {
      "id": "last-energy",
      "name": "Last Energy",
      "stage": "foak",
      "one_line_description": "US distributed-nuclear startup; 20 MWe modular plug-and-play microreactor for industrial off-takers. UK + Poland + Romania development pipeline; bypasses traditional grid-scale licensing path. Founded by Bret Kugelmass.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/last-energy"
    },
    {
      "id": "nuscale-power",
      "name": "NuScale Power",
      "stage": "foak",
      "one_line_description": "US light-water SMR developer (NYSE: SMR). 77 MWe modules; up to 12 modules per plant. First NRC-certified SMR design (Aug 2022). UAMPS Carbon Free Power Project cancelled Nov 2023 — restructured pipeline now focuses on RoPower Romania + Standard Power Ohio + KEPCO Korea.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/nuscale-power"
    },
    {
      "id": "oklo",
      "name": "Oklo",
      "stage": "public",
      "one_line_description": "Public advanced fission developer building the Aurora Powerhouse, a 15-75 MW liquid-metal-cooled fast reactor with a ~14 GW non-binding pipeline targeting AI data centers, with Atomic Alchemy subsidiary targeting first criticality by July 4 2026.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/oklo"
    },
    {
      "id": "radiant-nuclear",
      "name": "Radiant Industries",
      "stage": "series_d",
      "one_line_description": "Builds the 1 MW Kaleidos portable nuclear microreactor that ships by truck to replace diesel generators at military bases, remote industry, hospitals, and data centers, with first criticality at Idaho National Lab targeted for summer 2026.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/radiant-nuclear"
    },
    {
      "id": "terrapower",
      "name": "TerraPower",
      "stage": "foak",
      "one_line_description": "US advanced-reactor developer (Bill Gates + Khosla Ventures backed). Natrium sodium-cooled fast reactor with integrated molten-salt storage; 345 MWe + 500 MWe peaking. Kemmerer WY first-of-a-kind under construction since 2024 (non-nuclear systems first; targeting 2030 ops). DOE ARDP $2B cost-share.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/terrapower"
    },
    {
      "id": "westinghouse-electric",
      "name": "Westinghouse Electric",
      "stage": "commercial",
      "one_line_description": "US nuclear reactor + fuel OEM (Brookfield + Cameco owned since Sep 2023 $7.875B acquisition). AP1000 conventional LWR (deployed at Vogtle 3-4 + China Sanmen/Haiyang); AP300 SMR derivative announced May 2023. Largest US nuclear-fuel supplier.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/westinghouse-electric"
    },
    {
      "id": "x-energy",
      "name": "X-energy",
      "stage": "public",
      "one_line_description": "Developer of high-temperature gas-cooled small modular reactors using TRISO ceramic fuel pebbles, with first commercial deployment at Dow's Seadrift Texas petrochemical site under DOE's Advanced Reactor Demonstration Program.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/x-energy"
    }
  ],
  "faqs": [
    {
      "question": "What makes nuclear the cheapest firm-clean power in the US?",
      "answer_md": "The existing US fleet runs at a **$30/MWh** marginal cost (NREL ATB 2024), the cheapest firm-clean generation in the system, because fuel is negligible — uranium is only ~5% of the busbar cost. That low fuel exposure means nuclear doesn't ride the extractive cost up-curve. Combined with 24/7 availability, it sits below both the manufactured down-curve and the extractive up-curve as the firm floor the variable build relies on.",
      "source_id": null
    },
    {
      "question": "Why do nuclear plants run almost all the time when solar and wind don't?",
      "answer_md": "Nuclear's fleet-average **92.7% capacity factor** (EIA EPA 2024) is the highest of any US generation source, versus gas combined-cycle at 57%, coal 42%, hydro 37%, wind 35%, and solar 25%. The residual 7.3% downtime is refueling outages, typically every 18-24 months for 30-45 days. That near-100% year-round availability is the baseload variable solar and wind cannot deliver alone.",
      "source_id": null
    },
    {
      "question": "Is new nuclear actually cheap, or just the existing plants?",
      "answer_md": "It's the *existing* fleet that's cheap at $30/MWh — new conventional builds are expensive and slow. **Vogtle Units 3 and 4**, the only new US conventional build this century, came in at **$36.8B total, 2.6x the initial $14.3B estimate** and 7 years late (EIA TIE 61927). The Small Modular Reactor pipeline (Kairos, Oklo, X-energy, NuScale and others) proposes factory-fabricated modular construction targeting $60-110/MWh by the 2030s, with 9 NRC applications under active review.",
      "source_id": null
    },
    {
      "question": "Why are companies like Microsoft and Amazon signing deals for nuclear power?",
      "answer_md": "The hyperscaler PPA wave (Constellation/Microsoft at Three Mile Island, Talen/AWS at Susquehanna, Vistra/AWS at Comanche Peak) is driven by nuclear being **firm + clean + extant** all at once. Hyperscaler PPAs are the most concentrated forward demand signal anywhere in the energy economy, and nuclear meets that 24/7 demand profile better than any alternative the year a hyperscaler signs a 15-20 year contract. Nuclear already generates 18.8% of US electricity — the single largest clean-electricity source, exceeding wind plus solar combined.",
      "source_id": null
    }
  ],
  "related_sectors": [
    {
      "slug": "bioenergy",
      "title": "Bioenergy"
    },
    {
      "slug": "coal",
      "title": "Coal"
    },
    {
      "slug": "data-centers",
      "title": "Data Centers"
    },
    {
      "slug": "fusion",
      "title": "Fusion"
    },
    {
      "slug": "geothermal",
      "title": "Geothermal"
    },
    {
      "slug": "hydro",
      "title": "Hydro"
    },
    {
      "slug": "natural-gas",
      "title": "Natural Gas"
    },
    {
      "slug": "oil",
      "title": "Oil"
    },
    {
      "slug": "solar",
      "title": "Solar"
    },
    {
      "slug": "storage",
      "title": "Energy Storage"
    },
    {
      "slug": "the-grid",
      "title": "The Grid"
    },
    {
      "slug": "wind",
      "title": "Wind"
    }
  ],
  "embeds": [
    {
      "id": "nuclear-fission-two-curves",
      "title": "Nuclear: clean-firm incumbent below the curves.",
      "permalink": "https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves",
      "svg": "https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves.svg",
      "png": "https://moreenergycleanplanet.com/embed/nuclear-fission-two-curves.png"
    },
    {
      "id": "nuclear-fission-firm-role",
      "title": "Nuclear capacity factor: 92.7%.",
      "permalink": "https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role",
      "svg": "https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role.svg",
      "png": "https://moreenergycleanplanet.com/embed/nuclear-fission-firm-role.png"
    }
  ],
  "sources": [
    {
      "id": "eia-epa-2024",
      "title": "Electric Power Annual 2024",
      "url": "https://www.eia.gov/electricity/annual/pdf/epa.pdf",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "1,260 GW total US generating capacity; +48.6 GW added 2024."
    },
    {
      "id": "eia-electricity-monthly-2025",
      "title": "Electricity Monthly (Mar 2025 release)",
      "url": "https://www.eia.gov/electricity/monthly/",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "US generation by fuel; coal share 15.2% 2024."
    },
    {
      "id": "nrel-atb-2024-nuclear",
      "title": "2024 Annual Technology Baseline — Nuclear",
      "url": "https://atb.nrel.gov/electricity/2024/nuclear",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "LCOE bands for existing fleet + SMR pipeline + advanced reactors."
    },
    {
      "id": "nrc-new-reactors",
      "title": "New Reactor Applications",
      "url": "https://www.nrc.gov/reactors/new-reactors.html",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Pre-application + construction permit + operating license applications."
    },
    {
      "id": "eia-tie-61927",
      "title": "Vogtle Unit 4 begins commercial operation, completing nuclear expansion",
      "url": "https://www.eia.gov/todayinenergy/detail.php?id=61927",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Final cost $36.8B; first new US conventional nuclear build this century."
    }
  ],
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_sector",
      "get_cost_curve",
      "list_indicators",
      "get_sources"
    ]
  }
}
```