---
kind: sector
slug: geothermal
title: Geothermal
pillar: energy-production
status: live
as_of: 2026-11-09
updated_at: 2026-11-09
canonical_url: https://moreenergycleanplanet.com/sectors/geothermal/
json_url: https://moreenergycleanplanet.com/sectors/geothermal.json
license: CC BY 4.0
---

# Geothermal

> Geothermal turns underground heat into electricity. Enhanced and closed-loop systems expand the resource; operating plants, construction, contracts and technical potential remain distinct.

**Pillar:** [Energy Production](https://moreenergycleanplanet.com/sectors/energy-production) · **Status:** live · **As of:** 2026-11-09

## Key claims

- Enhanced geothermal adapts oil-and-gas drilling and reservoir engineering to produce electricity from hot rock beyond naturally permeable hydrothermal reservoirs. _(GeoVision Analysis Supporting Task Force Report: Electric Sector Potential to Penetration)_
- The U.S. geothermal fleet had a 65.9% capacity factor in 2025; fleet utilization is distinct from plant availability and the projected performance of new EGS projects. _(Electric Power Monthly: 2025 capacity factors, Table 6.07.B)_
- Fervo reports 33 MW of commercial operation at Cape Station from September 30, 2026, while its larger Google-backed expansion remains under construction. _(Fervo Energy Reports Third Quarter 2026 Results)_

## Analysis

Geothermal turns underground heat into electricity. Enhanced and closed-loop systems expand the resource; operating plants, construction, contracts and technical potential remain distinct.

### What it is: Heat from the Earth. Different ways to reach it.

Geothermal converts underground heat into electricity. Conventional hydrothermal projects need hot rock, fluid and a naturally permeable reservoir. The United States had [3,969 MW of installed geothermal nameplate capacity in 2024](https://nrel.sitefinity.cloud/geothermal/2025-us-geothermal-market-report/), concentrated in the West. Enhanced geothermal systems create flow paths in hot rock with drilled wells and engineered fractures. Closed-loop systems circulate fluid through underground wellbores instead of relying on a permeable reservoir. Ground-source heat pumps serve a different purpose: heating and cooling buildings rather than generating electricity.

The U.S. geothermal fleet generated 15.6 TWh in 2025, about 0.35% of utility-scale electricity generation. Its fleet capacity factor was [65.9%](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b), below nuclear's 91.1% but above gas combined cycle, hydro, wind and solar PV in the same EIA tables. Capacity factor measures annual utilization. It does not mean every plant is available without interruption, nor does it establish a new EGS project's future performance.

The drilling crossover is becoming operating infrastructure. [Fervo reports](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results) that Cape Station's first 33 MW block entered commercial operation on September 30, 2026. Two more 33 MW blocks were commissioning in November, with commercial operation targeted for January 1, 2027. The next approximately 400 MW expansion is under construction. Google's 396 MW, 15-year power purchase agreement supports that expansion, with first power targeted for mid-2028 and full capacity by the end of 2028. Those future megawatts are not operating supply today.

### Economics and scale: Weather-independent power. A cost target still to reach.

Geothermal's value is a source of electricity that does not depend on the weather. Its costs depend on reservoir temperature, drilling depth, flow, plant design, financing and operating performance. [DOE's Enhanced Geothermal Shot, announced in 2022](https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power), set a goal of $45/MWh for enhanced geothermal by 2035. That is a target, not an observed industry-wide cost. The generic conventional-geothermal cost band previously shown here is withheld until a comparable, reproducible source case is established.

[GeoVision's 2019 supporting analysis](https://docs.nlr.gov/docs/fy19osti/71833.pdf) estimated about 5,157 GW of deep-EGS technical resource potential in the continental United States at depths of 3–7 km and temperatures above 150°C. This was a modeled resource estimate, not a forecast of profitable plants or permission to develop every site. Geology, water, drilling, permitting, transmission and finance determine what can actually be built.

**Figure — Geothermal's illustrative cost crossover and DOE's $45/MWh EGS target for 2035; not a measured price trajectory.** Interactive chart and accessible data table: [/embed/geothermal-two-curves](/embed/geothermal-two-curves).

### Firm role: 65.9% fleet capacity factor in 2025.

**Figure — U.S. utility-scale fleet capacity factors, 2025: geothermal 65.9%; fleet utilization is distinct from uninterrupted plant availability.** Interactive chart and accessible data table: [/embed/geothermal-firm-role](/embed/geothermal-firm-role).

### Technology: Conventional, enhanced, closed-loop and pressure-based systems.

Conventional flash-steam and binary plants are established technologies. EGS adds engineered flow paths; closed-loop systems use a different heat-exchange design. Both borrow tools and capabilities from the oil and gas industry, but they should not be treated as the same technology or assumed to work economically at every site.

Eavor began partial electricity production at Geretsried in December 2025. [Its May 2026 technical disclosure](https://eavor.com/blog/technical-update-from-geretsried-what-we-built-what-we-learned-and-what-comes-next/) describes lower-than-designed thermal performance and water leakoff equal to 0.5–2% of circulating throughput. That evidence does not support a blanket zero-water-consumption claim. [Subsequent reporting](https://www.bayern-innovativ.de/en/emagazine/detail/what-will-become-of-the-second-loop-in-geretsried/) describes a pause in further buildout and commercial restructuring; the first loop remains operational. Full-project design capacity is not achieved output.

Sage's SMECI facility is a 3 MW pressure-storage project. [Its reported electricity sales](https://investor.wedbush.com/wedbush/article/bizwire-2026-8-19-sage-geosystems-places-smeci-facility-in-service-validating-key-elements-of-its-scalable-egs-approach) began in the second quarter of 2026. That is distinct from sustained geothermal electricity generation. Sage targets a first commercial generation installation with Ormat in 2027. Its Meta partnership targets up to 150 MW; this remains future development.

Quaise is developing superhot geothermal and millimeter-wave drilling. Project Obsidian was still in [resource-confirmation drilling in October 2026](https://www.quaise.com/news/confirming-the-resource-at-project-obsidian), using conventional drilling for its first wells. A funded development project is not proof of commercial millimeter-wave generation. Bedrock's building heating and cooling projects belong alongside this sector as applications of subsurface heat, not as additions to geothermal electricity capacity.

[Fervo, NVIDIA and PNNL announced EGS-Twin in June 2026](https://www.pnnl.gov/news-media/pnnl-teams-fervo-energy-and-nvidia-accelerate-geothermal-energy-development). The planned platform will use field data and AI to model geothermal reservoirs; PNNL targets deployment by 2029. It remains a tooling project, not an additional operating-power measurement.

### Thesis role: Operating blocks, repeat drilling and buyers for future supply.

Geothermal can complement nuclear, hydro, wind and solar with electricity that does not depend on weather. Large buyers can help finance repeat projects and drilling programs. Fervo's first commercial Cape block is evidence of deployment; Google's larger contract is evidence of demand for future supply. The next test is whether repeated projects lower delivered costs while meeting operating, water and permitting requirements.

### Policy drivers: Cost targets, tax credits and exploration rules.

DOE's 2022 Enhanced Geothermal Shot set the $45/MWh-by-2035 goal. Qualifying geothermal electricity projects can use [Sections 45Y](https://www.law.cornell.edu/uscode/text/26/45Y) or [48E](https://www.law.cornell.edu/uscode/text/26/48E), subject to project eligibility, labor, sourcing and other requirements. Current law retains the full phase-out percentage for construction beginning through 2033, then 75% in 2034, 50% in 2035 and zero from 2036. Those percentages apply to the otherwise available credit, not to project cost.

[BLM's April 2026 categorical exclusion](https://www.blm.gov/press-release/blm-takes-steps-accelerate-geothermal-energy-development) covers qualifying small-scale geothermal exploration with up to 10 acres of disturbance. It does not cover production or direct resource testing, and extraordinary-circumstances review still applies. [DOE completed environmental review in July 2026](https://www.energy.gov/documents/fervos-initial-400-mw-expansion-cape-geothermal-power-project-completion-letter) for a proposed loan guarantee covering an initial Cape expansion. That document is not evidence that a federal loan guarantee closed.

## Data

| indicator | value | goal (year) | as of | source |
|---|---|---|---|---|
| US installed geothermal nameplate capacity (2024) | 3.969 GW ⚠ stale | 60 GW (2050) | 2024-12-31 | 2025 U.S. Geothermal Market Report |
| Geothermal share of US utility-scale generation | 0.35 % | — | 2025-12-31 | Electric Power Monthly: 2025 net generation, Tables 1.1 and 1.1.A |
| US geothermal capacity factor | 65.9 % | — | 2025-12-31 | Electric Power Monthly: 2025 capacity factors, Table 6.07.B |
| EGS LCOE target (DOE Earthshot) | 45 USD/MWh ⚠ stale | 45 USD/MWh (2035) | 2022-09-08 | DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power |
| Cape Station announced combined buildout (approximate) | 500 MW | 500 MW (2028) | 2026-11-09 | Fervo Energy Reports Third Quarter 2026 Results |

## Companies

- **[Bedrock Energy](https://moreenergycleanplanet.com/ecosystem#company/bedrock-energy)** (commercial) — US distributed-geothermal startup for commercial + residential building heating. Borehole-drilling + ground-source heat-pump integration; ~25% lower drilling cost target. Cross-tag: also Pillar 2 buildings-and-transportation.
- **[Calpine](https://moreenergycleanplanet.com/ecosystem#company/calpine)** (commercial) _(primary: natural-gas)_ — Largest US natural-gas IPP. ~26 GW operating fleet (mostly CCGT). The Geysers geothermal (largest US geothermal complex; cross-tag). CCS partnerships announced 2024 (Bayonne NJ; Sutter CA). Cross-tag: also geothermal.
- **[Eavor Technologies](https://moreenergycleanplanet.com/ecosystem#company/eavor-technologies)** (foak) — Closed-loop geothermal developer. Geretsried began partial electricity production in December 2025; further buildout is paused while commercial arrangements are reworked.
- **[Fervo Energy](https://moreenergycleanplanet.com/ecosystem#company/fervo-energy)** (public) — Enhanced geothermal developer using horizontal drilling and AI-enabled subsurface analytics to deliver 24/7 carbon-free baseload power.
- **[Quaise Energy](https://moreenergycleanplanet.com/ecosystem#company/quaise-energy)** (series_b) — MIT spinout commercializing gyrotron-based millimeter-wave drilling to access superhot geothermal rock (>400 C) at depths beyond conventional drilling, with first commercial plant targeted for Central Oregon by 2030.
- **[Sage Geosystems](https://moreenergycleanplanet.com/ecosystem#company/sage-geosystems)** (foak) — Pressure-based geothermal and subsurface-storage developer. Its 3 MW SMECI storage facility began electricity sales in Q2 2026; a first commercial generation installation with Ormat is targeted for 2027. The Meta partnership targets up to 150 MW.
- **[XGS Energy](https://moreenergycleanplanet.com/ecosystem#company/xgs-energy)** (foak) — Closed-loop geothermal developer using conductive materials to improve subsurface heat transfer. Its Meta agreement targets a two-phase, 150 MW New Mexico development by 2030.

## FAQ

### What is the difference between conventional geothermal, EGS and closed-loop systems?

Conventional hydrothermal projects need naturally hot, permeable reservoirs containing fluid. EGS engineers flow paths in hot rock. Closed-loop designs circulate fluid through wellbores rather than relying on reservoir permeability. The 2024 U.S. nameplate fleet was 3.969 GW; historical deep-EGS technical potential is much larger but is not an economic deployment forecast. _(2025 U.S. Geothermal Market Report)_

### Is geothermal cheap enough to compete with gas?

Costs depend on the resource, drilling, plant design, financing and utilization. DOE set a $45/MWh EGS target for 2035 in 2022; it is not an achieved cost. The former generic $60-100/MWh conventional range is withheld pending a reproducible comparable case. A PPA price is not interchangeable with LCOE. _(DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power)_

### Why compare geothermal with nuclear?

Both can supply electricity without depending on sunshine or wind. EIA reports 2025 fleet capacity factors of 65.9% for geothermal and 91.1% for nuclear. These fleet averages do not guarantee uninterrupted availability or establish a new project's performance. _(Electric Power Monthly: 2025 capacity factors, Table 6.07.B)_

### How much of Cape Station is operating?

Fervo reports that Cape Station's first 33 MW block entered commercial operation on September 30, 2026. Two more 33 MW blocks were commissioning in November, with commercial operation targeted for January 1, 2027. The next approximately 400 MW expansion is under construction. Google's 396 MW, 15-year power purchase agreement supports that expansion, with first power targeted for mid-2028 and full capacity by the end of 2028. Those future megawatts are not operating supply today. The additional approximately 600 MW option is not a committed PPA. _(Fervo Energy Reports Third Quarter 2026 Results)_

## Charts (embeddable)

- **Geothermal: an illustrative cost crossover.** — https://moreenergycleanplanet.com/embed/geothermal-two-curves (https://moreenergycleanplanet.com/embed/geothermal-two-curves.svg · https://moreenergycleanplanet.com/embed/geothermal-two-curves.png)
- **Geothermal capacity factor: 65.9%.** — https://moreenergycleanplanet.com/embed/geothermal-firm-role (https://moreenergycleanplanet.com/embed/geothermal-firm-role.svg · https://moreenergycleanplanet.com/embed/geothermal-firm-role.png)

## Sources

- **nlr-geothermal-market-report-2025** — [2025 U.S. Geothermal Market Report](https://nrel.sitefinity.cloud/geothermal/2025-us-geothermal-market-report/) _(primary, report)_
- **eia-geothermal-generation-2025** — [Electric Power Monthly: 2025 net generation, Tables 1.1 and 1.1.A](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_01_a) _(primary, report)_
- **eia-geothermal-capacity-factor-2025** — [Electric Power Monthly: 2025 capacity factors, Table 6.07.B](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b) _(primary, report)_
- **doe-egs-shot** — [DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power](https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power) _(primary, report)_
- **fervo-q3-2026** — [Fervo Energy Reports Third Quarter 2026 Results](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results) _(self-reported, press-release)_
- **doe-geovision-electric-potential-2019** — [GeoVision Analysis Supporting Task Force Report: Electric Sector Potential to Penetration](https://docs.nlr.gov/docs/fy19osti/71833.pdf) _(primary, report)_

## Related sectors

[Bioenergy](https://moreenergycleanplanet.com/sectors/bioenergy.md) · [Coal](https://moreenergycleanplanet.com/sectors/coal.md) · [Data Centers](https://moreenergycleanplanet.com/sectors/data-centers.md) · [Fusion](https://moreenergycleanplanet.com/sectors/fusion.md) · [Hydro](https://moreenergycleanplanet.com/sectors/hydro.md) · [Natural Gas](https://moreenergycleanplanet.com/sectors/natural-gas.md) · [Nuclear Fission](https://moreenergycleanplanet.com/sectors/nuclear-fission.md) · [Oil](https://moreenergycleanplanet.com/sectors/oil.md) · [Solar](https://moreenergycleanplanet.com/sectors/solar.md) · [Energy Storage](https://moreenergycleanplanet.com/sectors/storage.md) · [The Grid](https://moreenergycleanplanet.com/sectors/the-grid.md) · [Wind](https://moreenergycleanplanet.com/sectors/wind.md)

## Machine access

- Structured data: https://moreenergycleanplanet.com/sectors/geothermal.json
- Live data via MCP: https://mcp.moreenergycleanplanet.com/mcp — tools: get_sector, get_cost_curve, list_indicators, get_sources
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "sector",
  "slug": "geothermal",
  "title": "Geothermal",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "status": "live",
  "theme_color": "#FFB627",
  "summary": "Geothermal turns underground heat into electricity. Enhanced and closed-loop systems expand the resource; operating plants, construction, contracts and technical potential remain distinct.",
  "analysis": "## What it is: Heat from the Earth. Different ways to reach it.\n\nGeothermal converts underground heat into electricity. Conventional hydrothermal projects need hot rock, fluid and a naturally permeable reservoir. The United States had [3,969 MW of installed geothermal nameplate capacity in 2024](https://nrel.sitefinity.cloud/geothermal/2025-us-geothermal-market-report/), concentrated in the West. Enhanced geothermal systems create flow paths in hot rock with drilled wells and engineered fractures. Closed-loop systems circulate fluid through underground wellbores instead of relying on a permeable reservoir. Ground-source heat pumps serve a different purpose: heating and cooling buildings rather than generating electricity.\n\nThe U.S. geothermal fleet generated 15.6 TWh in 2025, about 0.35% of utility-scale electricity generation. Its fleet capacity factor was [65.9%](https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b), below nuclear's 91.1% but above gas combined cycle, hydro, wind and solar PV in the same EIA tables. Capacity factor measures annual utilization. It does not mean every plant is available without interruption, nor does it establish a new EGS project's future performance.\n\nThe drilling crossover is becoming operating infrastructure. [Fervo reports](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results) that Cape Station's first 33 MW block entered commercial operation on September 30, 2026. Two more 33 MW blocks were commissioning in November, with commercial operation targeted for January 1, 2027. The next approximately 400 MW expansion is under construction. Google's 396 MW, 15-year power purchase agreement supports that expansion, with first power targeted for mid-2028 and full capacity by the end of 2028. Those future megawatts are not operating supply today.\n\n## Economics and scale: Weather-independent power. A cost target still to reach.\n\nGeothermal's value is a source of electricity that does not depend on the weather. Its costs depend on reservoir temperature, drilling depth, flow, plant design, financing and operating performance. [DOE's Enhanced Geothermal Shot, announced in 2022](https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power), set a goal of $45/MWh for enhanced geothermal by 2035. That is a target, not an observed industry-wide cost. The generic conventional-geothermal cost band previously shown here is withheld until a comparable, reproducible source case is established.\n\n[GeoVision's 2019 supporting analysis](https://docs.nlr.gov/docs/fy19osti/71833.pdf) estimated about 5,157 GW of deep-EGS technical resource potential in the continental United States at depths of 3–7 km and temperatures above 150°C. This was a modeled resource estimate, not a forecast of profitable plants or permission to develop every site. Geology, water, drilling, permitting, transmission and finance determine what can actually be built.\n\n**Figure — Geothermal's illustrative cost crossover and DOE's $45/MWh EGS target for 2035; not a measured price trajectory.** Interactive chart and accessible data table: [/embed/geothermal-two-curves](/embed/geothermal-two-curves).\n\n## Firm role: 65.9% fleet capacity factor in 2025.\n\n**Figure — U.S. utility-scale fleet capacity factors, 2025: geothermal 65.9%; fleet utilization is distinct from uninterrupted plant availability.** Interactive chart and accessible data table: [/embed/geothermal-firm-role](/embed/geothermal-firm-role).\n\n## Technology: Conventional, enhanced, closed-loop and pressure-based systems.\n\nConventional flash-steam and binary plants are established technologies. EGS adds engineered flow paths; closed-loop systems use a different heat-exchange design. Both borrow tools and capabilities from the oil and gas industry, but they should not be treated as the same technology or assumed to work economically at every site.\n\nEavor began partial electricity production at Geretsried in December 2025. [Its May 2026 technical disclosure](https://eavor.com/blog/technical-update-from-geretsried-what-we-built-what-we-learned-and-what-comes-next/) describes lower-than-designed thermal performance and water leakoff equal to 0.5–2% of circulating throughput. That evidence does not support a blanket zero-water-consumption claim. [Subsequent reporting](https://www.bayern-innovativ.de/en/emagazine/detail/what-will-become-of-the-second-loop-in-geretsried/) describes a pause in further buildout and commercial restructuring; the first loop remains operational. Full-project design capacity is not achieved output.\n\nSage's SMECI facility is a 3 MW pressure-storage project. [Its reported electricity sales](https://investor.wedbush.com/wedbush/article/bizwire-2026-8-19-sage-geosystems-places-smeci-facility-in-service-validating-key-elements-of-its-scalable-egs-approach) began in the second quarter of 2026. That is distinct from sustained geothermal electricity generation. Sage targets a first commercial generation installation with Ormat in 2027. Its Meta partnership targets up to 150 MW; this remains future development.\n\nQuaise is developing superhot geothermal and millimeter-wave drilling. Project Obsidian was still in [resource-confirmation drilling in October 2026](https://www.quaise.com/news/confirming-the-resource-at-project-obsidian), using conventional drilling for its first wells. A funded development project is not proof of commercial millimeter-wave generation. Bedrock's building heating and cooling projects belong alongside this sector as applications of subsurface heat, not as additions to geothermal electricity capacity.\n\n[Fervo, NVIDIA and PNNL announced EGS-Twin in June 2026](https://www.pnnl.gov/news-media/pnnl-teams-fervo-energy-and-nvidia-accelerate-geothermal-energy-development). The planned platform will use field data and AI to model geothermal reservoirs; PNNL targets deployment by 2029. It remains a tooling project, not an additional operating-power measurement.\n\n## Thesis role: Operating blocks, repeat drilling and buyers for future supply.\n\nGeothermal can complement nuclear, hydro, wind and solar with electricity that does not depend on weather. Large buyers can help finance repeat projects and drilling programs. Fervo's first commercial Cape block is evidence of deployment; Google's larger contract is evidence of demand for future supply. The next test is whether repeated projects lower delivered costs while meeting operating, water and permitting requirements.\n\n## Policy drivers: Cost targets, tax credits and exploration rules.\n\nDOE's 2022 Enhanced Geothermal Shot set the $45/MWh-by-2035 goal. Qualifying geothermal electricity projects can use [Sections 45Y](https://www.law.cornell.edu/uscode/text/26/45Y) or [48E](https://www.law.cornell.edu/uscode/text/26/48E), subject to project eligibility, labor, sourcing and other requirements. Current law retains the full phase-out percentage for construction beginning through 2033, then 75% in 2034, 50% in 2035 and zero from 2036. Those percentages apply to the otherwise available credit, not to project cost.\n\n[BLM's April 2026 categorical exclusion](https://www.blm.gov/press-release/blm-takes-steps-accelerate-geothermal-energy-development) covers qualifying small-scale geothermal exploration with up to 10 acres of disturbance. It does not cover production or direct resource testing, and extraordinary-circumstances review still applies. [DOE completed environmental review in July 2026](https://www.energy.gov/documents/fervos-initial-400-mw-expansion-cape-geothermal-power-project-completion-letter) for a proposed loan guarantee covering an initial Cape expansion. That document is not evidence that a federal loan guarantee closed.",
  "canonical_url": "https://moreenergycleanplanet.com/sectors/geothermal/",
  "markdown_url": "https://moreenergycleanplanet.com/sectors/geothermal.md",
  "json_url": "https://moreenergycleanplanet.com/sectors/geothermal.json",
  "updated_at": "2026-11-09",
  "as_of": "2026-11-09",
  "staleness_window_days": 400,
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "cite_url": "https://moreenergycleanplanet.com/sectors/geothermal.cite",
  "key_claims": [
    {
      "text": "Enhanced geothermal adapts oil-and-gas drilling and reservoir engineering to produce electricity from hot rock beyond naturally permeable hydrothermal reservoirs.",
      "source_id": "doe-geovision-electric-potential-2019"
    },
    {
      "text": "The U.S. geothermal fleet had a 65.9% capacity factor in 2025; fleet utilization is distinct from plant availability and the projected performance of new EGS projects.",
      "source_id": "eia-geothermal-capacity-factor-2025"
    },
    {
      "text": "Fervo reports 33 MW of commercial operation at Cape Station from September 30, 2026, while its larger Google-backed expansion remains under construction.",
      "source_id": "fervo-q3-2026"
    }
  ],
  "indicators": [
    {
      "id": "geothermal-installed-capacity-us",
      "name": "US installed geothermal nameplate capacity (2024)",
      "value": 3.969,
      "unit": "GW",
      "goal": 60,
      "goal_unit": "GW",
      "goal_year": 2050,
      "target_year": 2050,
      "as_of": "2024-12-31",
      "staleness_window_days": 400,
      "stale": true,
      "methodology": "2024 U.S. nameplate capacity 3.969 GW (about 4 GW). Goal: 60 GW by 2050 in the DOE GeoVision technology-improvement scenario, https://www.energy.gov/eere/geothermal/geovision . Observation year, source publication and scenario horizon are distinct.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-installed-capacity-us",
      "source_id": "nlr-geothermal-market-report-2025"
    },
    {
      "id": "geothermal-share-us-generation",
      "name": "Geothermal share of US utility-scale generation",
      "value": 0.35,
      "unit": "%",
      "goal": null,
      "goal_year": null,
      "as_of": "2025-12-31",
      "staleness_window_days": 400,
      "stale": false,
      "methodology": "2025 U.S. utility-scale generation share, all sectors. 0.35% rounded; calculation and denominator in source note. Not a capacity-factor measurement.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-share-us-generation",
      "source_id": "eia-geothermal-generation-2025"
    },
    {
      "id": "geothermal-capacity-factor-us",
      "name": "US geothermal capacity factor",
      "value": 65.9,
      "unit": "%",
      "goal": null,
      "goal_year": null,
      "as_of": "2025-12-31",
      "staleness_window_days": 400,
      "stale": false,
      "methodology": "65.9% U.S. utility-scale fleet capacity factor, annual 2025. EIA uses time-adjusted capacity, not the 2024 installed-nameplate figure.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-capacity-factor-us",
      "source_id": "eia-geothermal-capacity-factor-2025"
    },
    {
      "id": "geothermal-lcoe-egs-target",
      "name": "EGS LCOE target (DOE Earthshot)",
      "value": 45,
      "unit": "USD/MWh",
      "goal": 45,
      "goal_unit": "USD/MWh",
      "goal_year": 2035,
      "target_year": 2035,
      "projection": true,
      "as_of": "2022-09-08",
      "staleness_window_days": 540,
      "stale": true,
      "methodology": "Historical DOE target: $45/MWh by 2035, announced 2022-09-08. The current value records the target magnitude, not an observed electricity price.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-lcoe-egs-target",
      "source_id": "doe-egs-shot"
    },
    {
      "id": "geothermal-fervo-cape-capacity",
      "name": "Cape Station announced combined buildout (approximate)",
      "value": 500,
      "unit": "MW",
      "goal": 500,
      "goal_unit": "MW",
      "goal_year": 2028,
      "target_year": 2028,
      "projection": true,
      "as_of": "2026-11-09",
      "staleness_window_days": 540,
      "stale": false,
      "methodology": "Approximate planned buildout, not operating capacity. 3 x 33 MW Phase I plus approximately 400 MW expansion rounds to about 500 MW. Cape operating: 33 MW. Observation/source date 2026-11-09; buildout target 2028.",
      "anchor_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity",
      "source_id": "fervo-q3-2026"
    }
  ],
  "cost_curve": null,
  "companies": [
    {
      "id": "bedrock-energy",
      "name": "Bedrock Energy",
      "stage": "commercial",
      "one_line_description": "US distributed-geothermal startup for commercial + residential building heating. Borehole-drilling + ground-source heat-pump integration; ~25% lower drilling cost target. Cross-tag: also Pillar 2 buildings-and-transportation.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/bedrock-energy"
    },
    {
      "id": "calpine",
      "name": "Calpine",
      "stage": "commercial",
      "one_line_description": "Largest US natural-gas IPP. ~26 GW operating fleet (mostly CCGT). The Geysers geothermal (largest US geothermal complex; cross-tag). CCS partnerships announced 2024 (Bayonne NJ; Sutter CA). Cross-tag: also geothermal.",
      "primary_sector": "natural-gas",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/calpine"
    },
    {
      "id": "eavor-technologies",
      "name": "Eavor Technologies",
      "stage": "foak",
      "one_line_description": "Closed-loop geothermal developer. Geretsried began partial electricity production in December 2025; further buildout is paused while commercial arrangements are reworked.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/eavor-technologies"
    },
    {
      "id": "fervo-energy",
      "name": "Fervo Energy",
      "stage": "public",
      "one_line_description": "Enhanced geothermal developer using horizontal drilling and AI-enabled subsurface analytics to deliver 24/7 carbon-free baseload power.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/fervo-energy"
    },
    {
      "id": "quaise-energy",
      "name": "Quaise Energy",
      "stage": "series_b",
      "one_line_description": "MIT spinout commercializing gyrotron-based millimeter-wave drilling to access superhot geothermal rock (>400 C) at depths beyond conventional drilling, with first commercial plant targeted for Central Oregon by 2030.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/quaise-energy"
    },
    {
      "id": "sage-geosystems",
      "name": "Sage Geosystems",
      "stage": "foak",
      "one_line_description": "Pressure-based geothermal and subsurface-storage developer. Its 3 MW SMECI storage facility began electricity sales in Q2 2026; a first commercial generation installation with Ormat is targeted for 2027. The Meta partnership targets up to 150 MW.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/sage-geosystems"
    },
    {
      "id": "xgs-energy",
      "name": "XGS Energy",
      "stage": "foak",
      "one_line_description": "Closed-loop geothermal developer using conductive materials to improve subsurface heat transfer. Its Meta agreement targets a two-phase, 150 MW New Mexico development by 2030.",
      "ecosystem_url": "https://moreenergycleanplanet.com/ecosystem#company/xgs-energy"
    }
  ],
  "faqs": [
    {
      "question": "What is the difference between conventional geothermal, EGS and closed-loop systems?",
      "answer_md": "Conventional hydrothermal projects need naturally hot, permeable reservoirs containing fluid. EGS engineers flow paths in hot rock. Closed-loop designs circulate fluid through wellbores rather than relying on reservoir permeability. The 2024 U.S. nameplate fleet was 3.969 GW; historical deep-EGS technical potential is much larger but is not an economic deployment forecast.",
      "source_id": "nlr-geothermal-market-report-2025"
    },
    {
      "question": "Is geothermal cheap enough to compete with gas?",
      "answer_md": "Costs depend on the resource, drilling, plant design, financing and utilization. DOE set a $45/MWh EGS target for 2035 in 2022; it is not an achieved cost. The former generic $60-100/MWh conventional range is withheld pending a reproducible comparable case. A PPA price is not interchangeable with LCOE.",
      "source_id": "doe-egs-shot"
    },
    {
      "question": "Why compare geothermal with nuclear?",
      "answer_md": "Both can supply electricity without depending on sunshine or wind. EIA reports 2025 fleet capacity factors of 65.9% for geothermal and 91.1% for nuclear. These fleet averages do not guarantee uninterrupted availability or establish a new project's performance.",
      "source_id": "eia-geothermal-capacity-factor-2025"
    },
    {
      "question": "How much of Cape Station is operating?",
      "answer_md": "Fervo reports that Cape Station's first 33 MW block entered commercial operation on September 30, 2026. Two more 33 MW blocks were commissioning in November, with commercial operation targeted for January 1, 2027. The next approximately 400 MW expansion is under construction. Google's 396 MW, 15-year power purchase agreement supports that expansion, with first power targeted for mid-2028 and full capacity by the end of 2028. Those future megawatts are not operating supply today. The additional approximately 600 MW option is not a committed PPA.",
      "source_id": "fervo-q3-2026"
    }
  ],
  "related_sectors": [
    {
      "slug": "bioenergy",
      "title": "Bioenergy"
    },
    {
      "slug": "coal",
      "title": "Coal"
    },
    {
      "slug": "data-centers",
      "title": "Data Centers"
    },
    {
      "slug": "fusion",
      "title": "Fusion"
    },
    {
      "slug": "hydro",
      "title": "Hydro"
    },
    {
      "slug": "natural-gas",
      "title": "Natural Gas"
    },
    {
      "slug": "nuclear-fission",
      "title": "Nuclear Fission"
    },
    {
      "slug": "oil",
      "title": "Oil"
    },
    {
      "slug": "solar",
      "title": "Solar"
    },
    {
      "slug": "storage",
      "title": "Energy Storage"
    },
    {
      "slug": "the-grid",
      "title": "The Grid"
    },
    {
      "slug": "wind",
      "title": "Wind"
    }
  ],
  "embeds": [
    {
      "id": "geothermal-two-curves",
      "title": "Geothermal: an illustrative cost crossover.",
      "permalink": "https://moreenergycleanplanet.com/embed/geothermal-two-curves",
      "svg": "https://moreenergycleanplanet.com/embed/geothermal-two-curves.svg",
      "png": "https://moreenergycleanplanet.com/embed/geothermal-two-curves.png"
    },
    {
      "id": "geothermal-firm-role",
      "title": "Geothermal capacity factor: 65.9%.",
      "permalink": "https://moreenergycleanplanet.com/embed/geothermal-firm-role",
      "svg": "https://moreenergycleanplanet.com/embed/geothermal-firm-role.svg",
      "png": "https://moreenergycleanplanet.com/embed/geothermal-firm-role.png"
    }
  ],
  "sources": [
    {
      "id": "nlr-geothermal-market-report-2025",
      "title": "2025 U.S. Geothermal Market Report",
      "url": "https://nrel.sitefinity.cloud/geothermal/2025-us-geothermal-market-report/",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "2024 U.S. installed nameplate capacity: 3,969 MW across 99 plants. Nameplate is not EIA net summer capability. January 2026 publication; source observation year 2024."
    },
    {
      "id": "eia-geothermal-generation-2025",
      "title": "Electric Power Monthly: 2025 net generation, Tables 1.1 and 1.1.A",
      "url": "https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_01_a",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "2025 all-sector utility-scale geothermal generation 15.628 TWh. Total utility-scale generation 4,425.029 TWh in Table 1.1: https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_01 . Derived share 15.628 / 4425.029 * 100 = 0.35317%, rounded 0.35%; excludes estimated small-scale solar from denominator."
    },
    {
      "id": "eia-geothermal-capacity-factor-2025",
      "title": "Electric Power Monthly: 2025 capacity factors, Table 6.07.B",
      "url": "https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "2025 utility-scale fleet capacity factors: geothermal 65.9%, nuclear 91.1%, hydro 34.4%, wind 33.8%, solar PV 24.0%. Table 6.07.A gives gas combined cycle 58.7%. 2024 geothermal was 64.6%, not 75%. Utilization is not plant availability. Gas source: https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_a"
    },
    {
      "id": "doe-egs-shot",
      "title": "DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power",
      "url": "https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "DOE announced a goal to reduce EGS cost by 90% to $45/MWh by 2035. Historical target, not achieved cost or assured forecast; source date is September 8, 2022, not 2019 or 2035."
    },
    {
      "id": "fervo-q3-2026",
      "title": "Fervo Energy Reports Third Quarter 2026 Results",
      "url": "https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results",
      "publisher_tier": "self-reported",
      "source_type": "press-release",
      "note": "Company report: Cape GeoBlock 1, 33 MW, commercial September 30, 2026; company-wide operating 36 MW. Two further 33 MW Phase I blocks target January 1, 2027. Approximately 400 MW expansion under construction; 396 MW Google PPA for 15 years, first power mid-2028/full capacity end-2028. Additional approximately 600 MW is an option, not a binding PPA. Approximately 500 MW combined Cape buildout is planned capacity, not operating generation."
    },
    {
      "id": "doe-geovision-electric-potential-2019",
      "title": "GeoVision Analysis Supporting Task Force Report: Electric Sector Potential to Penetration",
      "url": "https://docs.nlr.gov/docs/fy19osti/71833.pdf",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Section 4.4, printed p.17: modeled 5,157 GWe continental-US deep-EGS technical resource, 3-7 km, >150 C. Tables ES-1/4 distinguish land-access-limited available resources. Not operating capacity, profitable supply or a deployment forecast."
    }
  ],
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_sector",
      "get_cost_curve",
      "list_indicators",
      "get_sources"
    ]
  }
}
```
