---
kind: indicator
slug: us-transmission-needs-2035
title: US transmission expansion needed by 2035 (interregional, high-growth scenario)
pillar: energy-production
sector: the-grid
unit: % expansion
as_of: 2023-06-30
updated_at: 2026-05-25
canonical_url: https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035/
json_url: https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035.json
license: CC BY 4.0
---

# US transmission expansion needed by 2035 (interregional, high-growth scenario)

**Energy Production / The Grid**

**Current value:** 412 % expansion (as of 2023-06-30) [stale]

**Goal:** 412 % expansion by 2035

**Trajectory:** rising

## Methodology

P1 delivery indicator. High-growth scenario; the canonical "more than 2x within / 5x interregional" public framing maps to 128% / 412%.

## Sources

- **doe-transmission-needs-2023** [National Transmission Needs Study](https://www.energy.gov/gdo/national-transmission-needs-study) _(gov, report)_

## Time series

No time-series snapshots yet: the feed has not landed. The current value above is the latest point.

## Machine access

- Structured data (JSON): https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035.json
- Full indicator dataset (JSON): https://moreenergycleanplanet.com/api/data/indicators.json
- This indicator as CSV: https://moreenergycleanplanet.com/api/data/indicators.csv?id=us-transmission-needs-2035
- Companies on this indicator: https://moreenergycleanplanet.com/ecosystem?indicator=us-transmission-needs-2035
- Sector page: https://moreenergycleanplanet.com/sectors/the-grid
- Live data via MCP server: https://mcp.moreenergycleanplanet.com/mcp (tools: get_indicator, list_indicators, rank_indicators, get_sources)
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "indicator",
  "id": "us-transmission-needs-2035",
  "name": "US transmission expansion needed by 2035 (interregional, high-growth scenario)",
  "slug": "us-transmission-needs-2035",
  "title": "US transmission expansion needed by 2035 (interregional, high-growth scenario)",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "sector": {
    "slug": "the-grid",
    "title": "The Grid"
  },
  "unit": "% expansion",
  "value": "412",
  "goal": "412",
  "goal_unit": "% expansion",
  "goal_year": 2035,
  "target_year": 2035,
  "trajectory": "rising",
  "projection": true,
  "as_of": "2023-06-30",
  "updated_at": "2026-05-25",
  "staleness_window_days": 540,
  "stale": true,
  "methodology": "P1 delivery indicator. High-growth scenario; the canonical \"more than 2x within / 5x interregional\" public framing maps to 128% / 412%.",
  "snapshots": [],
  "sources": [
    {
      "id": "doe-transmission-needs-2023",
      "title": "National Transmission Needs Study",
      "url": "https://www.energy.gov/gdo/national-transmission-needs-study",
      "publisher_tier": "gov",
      "source_type": "report",
      "note": "fn98 grid as largest machine framing; fn100 double regional / 5x interregional transmission by 2035."
    }
  ],
  "companies_url": "https://moreenergycleanplanet.com/ecosystem?indicator=us-transmission-needs-2035",
  "canonical_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035/",
  "markdown_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035.md",
  "json_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-transmission-needs-2035.json",
  "csv_url": "https://moreenergycleanplanet.com/api/data/indicators.csv?id=us-transmission-needs-2035",
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_indicator",
      "list_indicators",
      "rank_indicators",
      "get_sources"
    ]
  }
}
```
