# US interconnection queue capacity

**Energy Production / The Grid**

**Current value:** 2290 GW (as of 2024-12-31) [stale]

**Trajectory:** falling

## Methodology

P1 delivery indicator. Down 12% YoY from 2024-edition peak — driven by historic withdrawals, NOT by deployment clearing. Gas requests surged +72%. The shrinkage is structural reform pending, not "interconnection crisis solved."

## Sources

- **lbnl-queued-up-2025** [Queued Up: 2025 Edition](https://emp.lbl.gov/publications/queued-2025-edition-characteristics) _(primary, report)_

## Time series

No time-series snapshots yet: the feed has not landed. The current value above is the latest point.

## Machine access

- Structured data (JSON): https://moreenergycleanplanet.com/scorecard/energy-production/us-interconnection-queue-gw.json
- Full indicator dataset (JSON): https://moreenergycleanplanet.com/api/data/indicators.json
- This indicator as CSV: https://moreenergycleanplanet.com/api/data/indicators.csv?id=us-interconnection-queue-gw
- Companies on this indicator: https://moreenergycleanplanet.com/ecosystem?indicator=us-interconnection-queue-gw
- Sector page: https://moreenergycleanplanet.com/sectors/the-grid
- Live data via MCP server: https://mcp.moreenergycleanplanet.com/mcp (tools: get_indicator, list_indicators, rank_indicators, get_sources)
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "indicator",
  "id": "us-interconnection-queue-gw",
  "name": "US interconnection queue capacity",
  "slug": "us-interconnection-queue-gw",
  "title": "US interconnection queue capacity",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "sector": {
    "slug": "the-grid",
    "title": "The Grid"
  },
  "unit": "GW",
  "value": "2290",
  "goal": null,
  "goal_year": null,
  "trajectory": "falling",
  "as_of": "2024-12-31",
  "updated_at": "2026-05-25",
  "staleness_window_days": 400,
  "stale": true,
  "methodology": "P1 delivery indicator. Down 12% YoY from 2024-edition peak — driven by historic withdrawals, NOT by deployment clearing. Gas requests surged +72%. The shrinkage is structural reform pending, not \"interconnection crisis solved.\"",
  "snapshots": [],
  "sources": [
    {
      "id": "lbnl-queued-up-2025",
      "title": "Queued Up: 2025 Edition",
      "url": "https://emp.lbl.gov/publications/queued-2025-edition-characteristics",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Latest LBNL queue snapshot (year-end 2024): ~1,400 GW generation + ~890 GW storage = ~2,290 GW active. SUPERSEDES the prior 2,600 GW figure from the 2024 Edition. Decline driven by historic withdrawals + gas requests +72%, not by clearing."
    }
  ],
  "companies_url": "https://moreenergycleanplanet.com/ecosystem?indicator=us-interconnection-queue-gw",
  "canonical_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-interconnection-queue-gw/",
  "markdown_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-interconnection-queue-gw.md",
  "json_url": "https://moreenergycleanplanet.com/scorecard/energy-production/us-interconnection-queue-gw.json",
  "csv_url": "https://moreenergycleanplanet.com/api/data/indicators.csv?id=us-interconnection-queue-gw",
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_indicator",
      "list_indicators",
      "rank_indicators",
      "get_sources"
    ]
  }
}
```