---
kind: indicator
slug: nuclear-vogtle-cost-overrun-factor
title: Vogtle Units 3-4 cost overrun factor (final vs initial estimate)
pillar: energy-production
sector: nuclear-fission
unit: x multiplier
as_of: 2024-04-29
updated_at: 2026-05-28
canonical_url: https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor/
json_url: https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor.json
license: CC BY 4.0
---

# Vogtle Units 3-4 cost overrun factor (final vs initial estimate)

**Energy Production / Nuclear Fission**

**Current value:** 2.5 x multiplier (as of 2024-04-29) [stale]

**Trajectory:** rising

## Methodology

display: 2.5x (Vogtle 3-4 vs initial estimate) | EIA TIE 61927.

## Sources

- **eia-tie-61927** [Vogtle Unit 4 begins commercial operation, completing nuclear expansion](https://www.eia.gov/todayinenergy/detail.php?id=61927) _(primary, report)_

## Time series

No time-series snapshots yet: the feed has not landed. The current value above is the latest point.

## Machine access

- Structured data (JSON): https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor.json
- Full indicator dataset (JSON): https://moreenergycleanplanet.com/api/data/indicators.json
- This indicator as CSV: https://moreenergycleanplanet.com/api/data/indicators.csv?id=nuclear-vogtle-cost-overrun-factor
- Companies on this indicator: https://moreenergycleanplanet.com/ecosystem?indicator=nuclear-vogtle-cost-overrun-factor
- Sector page: https://moreenergycleanplanet.com/sectors/nuclear-fission
- Live data via MCP server: https://mcp.moreenergycleanplanet.com/mcp (tools: get_indicator, list_indicators, rank_indicators, get_sources)
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "indicator",
  "id": "nuclear-vogtle-cost-overrun-factor",
  "name": "Vogtle Units 3-4 cost overrun factor (final vs initial estimate)",
  "slug": "nuclear-vogtle-cost-overrun-factor",
  "title": "Vogtle Units 3-4 cost overrun factor (final vs initial estimate)",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "sector": {
    "slug": "nuclear-fission",
    "title": "Nuclear Fission"
  },
  "unit": "x multiplier",
  "value": "2.5",
  "goal": null,
  "goal_year": null,
  "trajectory": "rising",
  "as_of": "2024-04-29",
  "updated_at": "2026-05-28",
  "staleness_window_days": 400,
  "stale": true,
  "methodology": "display: 2.5x (Vogtle 3-4 vs initial estimate) | EIA TIE 61927.",
  "snapshots": [],
  "sources": [
    {
      "id": "eia-tie-61927",
      "title": "Vogtle Unit 4 begins commercial operation, completing nuclear expansion",
      "url": "https://www.eia.gov/todayinenergy/detail.php?id=61927",
      "publisher_tier": "primary",
      "source_type": "report",
      "note": "Final cost $36.8B; first new US conventional nuclear build this century."
    }
  ],
  "companies_url": "https://moreenergycleanplanet.com/ecosystem?indicator=nuclear-vogtle-cost-overrun-factor",
  "canonical_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor/",
  "markdown_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor.md",
  "json_url": "https://moreenergycleanplanet.com/scorecard/energy-production/nuclear-vogtle-cost-overrun-factor.json",
  "csv_url": "https://moreenergycleanplanet.com/api/data/indicators.csv?id=nuclear-vogtle-cost-overrun-factor",
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_indicator",
      "list_indicators",
      "rank_indicators",
      "get_sources"
    ]
  }
}
```
