---
kind: indicator
slug: geothermal-fervo-cape-capacity
title: Cape Station announced combined buildout (approximate)
pillar: energy-production
sector: geothermal
unit: MW
as_of: 2026-11-09
updated_at: 2026-11-12
canonical_url: https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity/
json_url: https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity.json
license: CC BY 4.0
---

# Cape Station announced combined buildout (approximate)

**Energy Production / Geothermal**

**Current value:** 500 MW (as of 2026-11-09)

**Goal:** 500 MW by 2028

**Trajectory:** rising

## Methodology

Approximate planned buildout, not operating capacity. 3 x 33 MW Phase I plus approximately 400 MW expansion rounds to about 500 MW. Cape operating: 33 MW. Observation/source date 2026-11-09; buildout target 2028.

## Sources

- **fervo-q3-2026** [Fervo Energy Reports Third Quarter 2026 Results](https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results) _(self-reported, press-release)_

## Time series

No time-series snapshots yet: the feed has not landed. The current value above is the latest point.

## Machine access

- Structured data (JSON): https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity.json
- Full indicator dataset (JSON): https://moreenergycleanplanet.com/api/data/indicators.json
- This indicator as CSV: https://moreenergycleanplanet.com/api/data/indicators.csv?id=geothermal-fervo-cape-capacity
- Companies on this indicator: https://moreenergycleanplanet.com/ecosystem?indicator=geothermal-fervo-cape-capacity
- Sector page: https://moreenergycleanplanet.com/sectors/geothermal
- Live data via MCP server: https://mcp.moreenergycleanplanet.com/mcp (tools: get_indicator, list_indicators, rank_indicators, get_sources)
- License: CC BY 4.0

```json
{
  "schema_version": "1.2",
  "kind": "indicator",
  "id": "geothermal-fervo-cape-capacity",
  "name": "Cape Station announced combined buildout (approximate)",
  "slug": "geothermal-fervo-cape-capacity",
  "title": "Cape Station announced combined buildout (approximate)",
  "pillar": {
    "slug": "energy-production",
    "title": "Energy Production"
  },
  "sector": {
    "slug": "geothermal",
    "title": "Geothermal"
  },
  "unit": "MW",
  "value": "500",
  "goal": "500",
  "goal_unit": "MW",
  "goal_year": 2028,
  "target_year": 2028,
  "trajectory": "rising",
  "projection": true,
  "as_of": "2026-11-09",
  "updated_at": "2026-11-12",
  "staleness_window_days": 540,
  "stale": false,
  "methodology": "Approximate planned buildout, not operating capacity. 3 x 33 MW Phase I plus approximately 400 MW expansion rounds to about 500 MW. Cape operating: 33 MW. Observation/source date 2026-11-09; buildout target 2028.",
  "snapshots": [],
  "sources": [
    {
      "id": "fervo-q3-2026",
      "title": "Fervo Energy Reports Third Quarter 2026 Results",
      "url": "https://ir.fervoenergy.com/news-releases/news-release-details/fervo-energy-reports-third-quarter-2026-results",
      "publisher_tier": "self-reported",
      "source_type": "press-release",
      "note": "Company report: Cape GeoBlock 1, 33 MW, commercial September 30, 2026; company-wide operating 36 MW. Two further 33 MW Phase I blocks target January 1, 2027. Approximately 400 MW expansion under construction; 396 MW Google PPA for 15 years, first power mid-2028/full capacity end-2028. Additional approximately 600 MW is an option, not a binding PPA. Approximately 500 MW combined Cape buildout is planned capacity, not operating generation."
    }
  ],
  "companies_url": "https://moreenergycleanplanet.com/ecosystem?indicator=geothermal-fervo-cape-capacity",
  "canonical_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity/",
  "markdown_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity.md",
  "json_url": "https://moreenergycleanplanet.com/scorecard/energy-production/geothermal-fervo-cape-capacity.json",
  "csv_url": "https://moreenergycleanplanet.com/api/data/indicators.csv?id=geothermal-fervo-cape-capacity",
  "license": "CC BY 4.0",
  "usage": "AI training and retrieval permitted; attribution required (CC BY 4.0). Cite as More Energy, Clean Planet.",
  "mcp": {
    "server": "https://mcp.moreenergycleanplanet.com/mcp",
    "tools": [
      "get_indicator",
      "list_indicators",
      "rank_indicators",
      "get_sources"
    ]
  }
}
```
